New Client Implementation Schedule

From Idrive
Jump to navigation Jump to search

Pre Sale Engineering

  • Client Personnel
    • Day to day contacts
    • Finance
    • IT
    • Fleet
    • Mechanics
    • Safety
    • Pre Implementation Engineering w/Support


Client Locations (qty)

  • Parking
    • Facing the AP
    • Distance from PC to AP
    • From Vehicles to AP
    • frequency of Parking
    • vehicles power cut Off?
    • Types of vehicles
    • Number of vehicles per location
    • GSMs?
      • Cellular Download
      • Tracking (Live Look In) only
    • Driver ID?
    • Facial Recognition


Camera Installation

    • Client install
    • Idrive Install
    • Train the Trainer
    • Other?


  • Access Point location
    • Or Cellular only
    • Or Cellular and Access Point mixed
    • Multiple Access Points needed?
      • Additional Hardware
        • additional APs
        • cables
        • length of needed cables
        • multi-port switches
        • High Power PoE(s)
        • WiFi Bridges


  • Base Station requirements
    • Always ON Internet type
    • larger HDD
    • Terminal
      • Download Point


  • Access Point location
    • Or Cellular only
    • Or Cellular and Access Point mixed
    • Multiple Access Points needed?
      • Additional Hardware
        • additional APs

After Sale Installation procedures

  • Order of Installation
  1. Base Station and Internet connection
  2. Idrive Support contacted and logged in to configure
  3. Access Points(s) Installed and Configured


  • Employee Introduction


  • Vehicles
    • Vehicle Availability
      • plan on 45 min average install time (per installer)
    • Vehicle Nomenclature
      • Weights
    • Driver Info (if needed)