Stonkam IDGSDVR Initial Configuration and Setup
Stonkam Manual can be found at http://183.233.190.23:6061/dd.php?id=0i7d
Items Needed for Setup
- New IDGSDVR unit w/ accessory kit
 - New SSD
 - Power Supply
 - Power & Ground banana plugs to 8 pin power cable
 - A input/output medium, i.e.
- Remote control + 6 pin to RCA cable with RCA to USB adapter for viewing on Amcap software (yellow is video)
 - Remote control + 6pin to 4 pin adapter cable + monitor
 - Stonkam 6 pin Touch Screen monitor
 
 - SIM Card
 
NOTE: the 6 pin video out is labeled "AV OUT"
Login
Admin Account
User Names are case sensitive
Default user name admin
Default password 123
After Config:
user name admin
password IDGD8
Routine Setup
Follow along with a IDGSDVR Configuration Checklist.
Install Batteries in Remote Control
From the accessory kit. We will not be sending a remote control for each DVR. We will ship some quantity to a location and only these need to have batteries installed.
Install SIM Card Installation
Document the number on the Traveler
Keep the plastic card and note the IDGSDVR serial number on it.
Install and Format Hard Drive
Click on the Floppy Disk Icon on main menu
Wait for a format successful message. (this should take approximately 20 Seconds for a 1TB hard drive)
Document Device ID / Serial Number
Each Stonkam DV454 & 456 has a 9 digit unique Device ID (Serial Number) Located in System>Info
Write this down on the traveler.
- Device ID (AC uses this as the DVR Serial Number)
 
- Printed on the Label which goes on the DVR
 
Example: Device ID 307260025 will be Serial Number 307260025
Upgrade Firmware and Verify
There are two versions of the firmware - one for the 8 channel IDGSDVR and one for the 4 channel version
8 channel : dv454_upgrade_20230708.1737_idrive_Rename
4 Channel : dv456_upgrade_20230708.1737_idrive_Rename
Get current version from Teams 20230708.1737
Place Firmware on USB stick with the full path:
/upgrade/packet/local/dv454_upgrade_20230708.1737_idrive_Rename
After upgrade the system removes the FW from the USB Stick so you must re-copy it for the next upgrade
Install Config File for vehicle type (Handler or Crane)
Download contains 8 configuration files. 4 for Cranes files, 4 for Loader files, 4 of each type for US time zones(EST, CST, MST, PST)
[|Stonkam BNSF IDGSDVR Config Files 082423]
Set device/vehicle specific settings (tag device with vehicle number) (document on traveler)
- License No. (vehicle name)
 
- Device No. (EX: 307260025)
 
- Time Zone – verify time correct for that zone
 
- Anything else specific to this one device?
 
Save Configuration to hard drive and keep a copy in the support folder
SSD
Export the configuration to the SSD
Thumb drive
Export the configuration to a Thumb drive.
Copy the config file to our system (Idrive Support> BNSF> Config_files> Location Name> vehicle_number_sv_xml.xml)
This way we have a record in case we need it.
Labels
Print 3 IDGSDVR S/N Labels (one for IDGSDVR, one for the DVR box and one for outside of the shipping box)
- Label on Front of IDGSDVR as shown (So Installer and Customer can identify the device for support)
 
- Idrive IDGSDVR
 
- IDGSDVR S/N – (UID ALL 9 digits)
 
- SIM S/N
 
- Label Download (template requires Zebra Designer software to open)
 
Remove Extra Items from DVR Kit
Remote Control (this will be shipped in the Location Items box)
Keys (ship one with the individual DVR and save the second at Idrive)
Monitor Cable (6pin - 4 pin)(this will be shipped in the Location Items box?)
CAN Cable
Alarm Cable
Serial Cable
Network Cable
Pack DVR For shipping
- Camera and Cable Kits will be packed in separate box. (Only the IDGSDVR is vehicle specific however the Crane package will be different and marked accordingly)
 
TBD ( If Ordered) *Each location will receive a Monitor, Monitor Cable, Extra Hard Drive, Hard drive reader(back ordered), A few remote controls and sets of keys.
Enter IDGSDVR into Admin Center
In the Manufacturing section select the "D4-DVR Production" Tab
- click Add (Upper right in small font)
 
- Select DVR Type (D8)
 
- Enter serial number ("Device Id")
 
- Click Add Device
 
- Assign Device to the Customer and Location
 
For BSNF adjust the Warranty to three years (add two years to the default warranty date)
Assign IDGSDVR to a Vehicle in Iris
Log into Iris at https://iris.idriveglobal.com
- Select the company you want to manage (if not Idrive Inc)
 
- click on your account and select the desired company(upper right round circle with silhouette in it)
 
- Go to Fleet Manager => Vehicles > Location and add vehicle (if it does not already exist)
 
- Select the Configure Tab and click the Edit button (lower right)
 
- Click "Add device"
 
- Click the "D Series" button and select the desired IDGSDVR
 
- Click "Assign"
 
- Click "Save" at the bottom right
 
Assign IDRSDVR to a BNSF Vehicle using Control Center
Please use Iris - this is the old method
- Log into the "BNSF CC" (in RMA area)
 
- Go to Fleet Manager => Personnel => Add new person and fill in the appropriate info
 
- Go to Vehicles => Add new vehicle => Fill in the appropriate info
 
- Go to Devices/Drivers section => D4 Device => and click on the "..." button
 
- Select the serial number
 
- Click Assign
 
- Click Save Vehicle
 
Set Alerts in Iris
Select the Alerts tab for the desired Vehicle
- Select the "Type" (DVR in this case)
 
- Geofence
 
- DVR
 
- Severe Shock
 
- Events
 
- Select the Subtype(s)
 
- DVR camera disconnected
 
- DVR not Recording
 
- DVR camera reconnected
 
- Set the Notification Type (Emails)
 
Select an email you want to send this alert notification to
- Terminal Manager or appointed location manager
 
- bnsfalerts@idriveglobal.com (distribution list for Idrive)
 
Assign and Activate SIM In Podsystems (Activate at ship time)
Assign and Activate SIMs at ship time.
Log in Podsuite
- Username:
 
- Password:
 
Click on Subscriptions > All Subscribers
Select the desired SIM
- Enter the last 7 numbers of the SIM in the search window and click the magnifying glass
 
- Click on the serial number
 
Edit eSIM profile
- Click on "Edit this eSIM Profile"
 
- Enter Name: "Customer/Location/Vehicle" Example BNSF LPC T0314
 
- Enter Group Name "IDGSDVR"
 
- Click "Apply Settings"
 
Activate eSIM At Ship Time
- Click on "Subscribe
 
- Select Product
 
- For US ...
 
- Select Start date (1st of the Month or Today)
 
- Click Next
 
- Type "SUBSCRIBE" in the window and click Subscribe
 
Kit the other items for the vehicle (Cameras, Cables)
Main Menu
The Main Menu is Displayed by pressing Menu on the remote. If using a touch screen touch the bottom half of the screen. Entering any of these menus will stop the device from recording.
- 1)**Manually Control - Record, Play, Stop, FF, RW
 
- 2)**Playback - Search by date & Time
 
- 3)**Logs - System & Export Logs
 
- 4)*Display Mode - Switch Grid view from Channels 1-4, 5-8 or 1-8
 
- 5)**Configuration Settings - Record,Display, Network & System settings
 
- 6)**Storage - Manage SSD, SD, USB
 
- 7)**Volume - Playback Volume
 
Manually Control
Playback
A date marked in green indicates that there were videos recorded that day.
Click the day to view the list of enter the video files for that date
Choose the desired video and press the Play button.
- You can play single or multiple videos
 
- Multiple videos can be played in sequence and can shift into the next or the previous one.
 
Select and Play Videos
- Normal
 
- Event
 
- Capture
 
- Play
 
- Export
 
- All
 
- Exit
 
Logs
Used to keep a log of events in the system
Navigate to Menu->Setup->Log
System Log
Feature allows you to search the Systems Log of events on the machine
This log can be found on the hard drive in the "Log" folder
Video Loss now is shown in Syslog
- Disconnect camera #1 "Camera State Change:227"
 
- Reconnect camera #5 "Camera State Change:224"
 
- Disconnect camera #5 "Camera State Change:240"
 
- Reconnect camera #5 "Camera State Change:224"
 
Also no "Fault" light
Export Log
Use this feature to export the system log.
Log can be exported to SSD, SD, USB
Configuration Settings
Record
Picture is incorrect listed settings are correct
- Power On Rec ON
 
- Cyclic Rec. - Overwrite? ON
 
- Event Rec. OFF Event recording refers to the alarm recording triggered by events
 
- Event Rec. Lock Reserved
 
- *Video Quality - Settings for Main Stream, Sub Stream, JPG
 
- *Record Channel - turn on/off recording for each channel
 
- IPC - IP Cameras 9 - 12 settings
 
- Event Duration - 10 Seconds When the “Event Rec” is set to ON, the video file length
 
- File Length - 5 Minutes
 
- Motion Sensitivity - OFF
 
- G-Force Sensitivity - OFF
 
- File Type - AVI
 
- Record Audio - AVI
 
Video Quality
Verify impact on look-ins and cellular data
- Main Stream
 
- Resolution: 720p
 
- Bit Rate: 512Kbps
 
- Frame Rate: 15fps
 
- Sub Stream
 
- Resolution: CIF(NTSC)
 
- Bit Rate: 64Kbps
 
- Frame Rate: 25fps
 
- JPG
 
- Frame Rate: LOW
 
Record Channel
Green means channel is enabled to record.
Loaders use channels 1,2,3,4
Cranes (mostly) use channels 1,2,3,4,5,6,7,8
Display
*Camera - Brightness, Contrast Etc for each Camera
*Cam Name - Name of Channel on Display
*Language - Set system Language
*Audio Out - Select Channel Audio to listen to
*OSD - On Screen Display Information
*Menu On - How lon Menu is Displayed before logout
*Speed - Speed Settings
*GPS - GPS Location Information
*Mirror - Mirror the Camera Image
*Sys Format - NTSC, PAL, Auto
*Radar - ??
Camera
Individual Camera settings:
- Brightness
 
- Contrast
 
- Saturation
 
- Hue
 
Cam Name
Each camera has its own channel with its own "channel name".
Navigate to the display tab by hitting Menu->Setup->Display
Choose which camera name you would like to change by selecting its associated channel name. (8 letters max)
Loader Cam Names
- CH1 - CAB
 
- CH2 - L-Front
 
- CH3 - R-Front
 
- CH4 - Rear
 
Crane Cam Names
- CH1 - CAB
 
- CH2 - L-Front
 
- CH3 - R-Front
 
- CH4 - Far-Side
 
- CH5 - CH8 - these channels need to be mirrored for cranes
 
Language
To edit the language of the device access Menu->Setup->Display->Language
Select which language you want from the buttons presented. Languages available are English, French, German, Russian, Japanese, Italian, Austrian
Audio Out (N/A for BNSF)
This setting edits the output for the audio channel in split mode
Navigate to this setting by selecting Menu->Setup->Display->Audio Out
Select which camera's audio you would like to output.
OSD
OSD controls what information gets overlayed on the video of each camera.
Navigate to this setting by selecting Menu->Setup->Display->OSD
- Time - ON
 
- License - ON
 
- Camera Names - ON
 
Menu On
Sets the duration of time the menu will display on the screen.
Navigate to this setting by selecting Menu->Setup->Display->Menu On
Settings: 30, 60, 120 seconds, or always on. ::*Time - Always On
The menu lock setting will lock the menu to be password protected.
A password is needed to change this setting
- Menu Lock - ON
 
Speed
Allows you to change the source of the displayed speed to either the GPS or the vehicle speedometer as well as the units of speed to be either kph or mph
Navigate to this setting by selecting Menu->Setup->Display->Speed
GPS
Displays information of latitude/longitude, detectable satellites, connected satellites, speed, and time
Navigate to this setting by selecting Menu->Setup->Display->GPS
Mirror
Mirrors the video output on the selected camera. Configurable to each camera
Navigate to this setting by selecting Menu->Setup->Display->Mirror
SYS FORMAT
Set NTSC/PAL/AUTO
Network
*Lan - Lan Settings
*Wifi - Wifi Settings
*Cellular - Cellular Settings
*Status - Networks Status
*Server - Server Settings
*Upload Files - Upload settings Settings
RTSP - RTSP Settings
LAN
Defaults:
- IP Address 192.168.100.188 set to 192.168.0.250
 
- Mask 255.255.255.0
 
- Gateway 192.168.100.1 set to 192.168.0.1
 
- MAC Add: 7e:97:15:xx:xx:xx
 
Notes:
I can ping it but not login. There does not appear to be any access from the network only connectivity with a local server
WiFi
N/A - Optional
Wi-Fi ON/OFF
DHCP On/Off
Ap Internet (new setting) Off
need new picture
Cellular
- Cellular - ON
 
- Standard - WCDMA
 
- APN - data641003
 
- Access No. - *99#
 
- User Name - BLANK Can only be set by Config file
 
- Password - Blank Can only be set by Config file
 
Status
Displays information on:
- Lan IP address
 - MAC Address
 - 4G Network Status
 - 4G Signal Strength
 - Wifi Network Status
 - Wifi IP Address
 - Wifi Signal Strength
 - Server Status
 - Network Connectivity
 
Server
Server Address: lti-api.idriveglobal.com Port 8898
Server Address for AI integration 52.87.0.30 Port 9090 dvr-api.idriveglobal.com Port 9090
Upload Files
- Upload Files - ON
 
- Cellular - ON
 
- Normal Files - OFF
 
- Status - x
 
RTSP
System
*User - User Password
*Device - Vehicle, Device, Path information
*Schedule - Timed Recording
*Exception - Buzzer On/Off and duration
*Acc -
*Alarm -
*Update -
*Config -
*Info -
User
Device
License No. - Default:(AAAAAA) Set to Vehicle Name
Device ID - Default:(BBBBBB) Set to UID(last 8 Digits only) Example: 07270002
Path No. - Default (CCCCCC) Not Used (removed in later FW releases)
From Stonkam 8/11/17 "it is a feature reserved for adding bus number in the future if the customer needs"
Date & Time
Out of Date - missing Time Sync, Daylight Savings
Set for customer location
Timezone: Set to PST is -8
Time Sync: Set to GPS on NTP off
Enable: Set to ON
Start time / End time: Set to As Shown
Schedule
Used to schedule up to 4 recording tasks.
Recording settings include a start & end time as well as day of the week to record.
Note: Recordings are permitted to overlap
Exception
Settings to configure a buzzer when certain errors occur.
Example: Buzzer when camera becomes disconnected
ACC
Displays:
- Current voltage of the DVR
 - Shutdown voltage- If voltage < shutdown voltage then dvr shuts down, powers back on only when voltage exceeds shutdown voltage
 - ACC Delay- Continued recording after ACC is disconnected. Options are 5,30,60 seconds
 
FW 20180117 changes ACC Delay values to 5s, 60s, 30min, 60min
Alarm
Need picture update
Alarm Out - all to off
Alarm Rec. - Off
Update
Process takes ~ 3 Minutes
There are two versions of the firmware - one for the 8 channel IDGSDVR and one for the 4 channel version
8 channel : dv454_upgrade_20230708.1737_idrive_Rename
4 Channel : dv456_upgrade_20230708.1737_idrive_Rename
Ensure you are using the latest FW version (Download from IDG DVR group in Teams)
Copy the firmware to USB stick or SD card root directory.
Insert the USB Stick into the IDGSDVR.
Either:
- Reboot the IDGSDVR or
 
- Navigate to Menu -> Setup -> System -> Update> Hit OK
 
Wait for Update Success!
Remove the USB Stick or the IDGSDVR will continually update
Verify that the update was successful by Menu -> Setup -> System -> Info
Compare the current version to the desired version.
Config
Missing Auto Reboot setup
Note: When you select Import or Export it executes with "OK" you think it is hung but is working
Import
Insert the USB with the appropriate configuration file sv_xml.xml in its root directory
for example for USB you must use this structure: "Export_file\config\sv_xml.xml"
Eric's note: filename must match exactly, you might have to rename if downloaded from the AC
Select the import button
Export
Select Export, Select location (SSD or USB or SD)
Saves sv_xml.xml to location
Factory Reset
Auto Reboot
On/Off, Day of Week, Time of Day
Set to On, Sunday, 02:00AM
Storage
Filesystem Structure
Log4Gui - ASCII System Log
test_writable - system test if disk read only?
Normal Folder - location where videos are stored
- 20170801 Folder - separate folder for each date
 
- Video files naming example: 20170801150248_NM_0030_0001_1920_1080_25_04194304_AAAAAA_02.avi
 
- 2017^08^01^ - Year^Month^Day
 
- 15^02^48 - Hour^Minute^Second (from start?)
 
- _NM_0030_0001_1920_1080_25_04194304_ Figure this out
 
- AAAAAA_02 - Vehicle_Channel
 
Volume
Set the playback volume via the remote.  The default volume is 5.
Minimum volume: 1
Maximum volume: 10
Detailed Assembly Instructions
SIM Card Installation
Step 1: Unlock the IDGSDVR with its key, and open the side flap on the front panel and open the door to the right.
Document SIM Number and Insert SIM Into the IDGSDVR
Hard Drive
Step 1: Unlock the IDGSDVR with its key, and open the side flap on the front panel and open the door to the right.
Step 2: Slide the new hard drive into the DVR making sure a solid connection is made with the hard drive.
Format Hard Disk Detail
Format SSD (xx seconds for 1TBB)
Press the orange floppy disk icon to access the disk management settings
Select which disk you would like to format.
Note once formatted all data on this disk will be lost
Acknowledge that you would like to proceed with the format.
Wait for a format successful message. (this should take approximately 5 minutes for a 500GB hard drive)
Firmware Versions Changes/Notes
Displays system software version number
Update the picture with the current (new) version
Previous Versions
| Stonkam 8 Channel Firmware release versions | ||||
|---|---|---|---|---|
| Release Date | Sys Version | MCU Version | Description/Notes | |
| x | x | x | x | |
| 8/23/23 | 20230707.1737 | 2023040309 | Initial Release | |
| 8/31/23 | 20230708.1737 | 2023040309 | Update | |
| 8/9/23 | 20230809.1808 | 2023040309 | VGA | 
| Stonkam 4 Channel Firmware release versions | ||||
|---|---|---|---|---|
| Release Date | Sys Version | MCU Version | Description/Notes | |
| x | x | x | x | |
| 8/23/23 | 20230707.1737 | 2023040309 | Initial Release | |
| 8/31/23 | 20230708.1737 | 2023040309 | Update | |
| 9/1/23 | 20230901.1787 | 2023040309 | 360 degree | 
Cellular connectivity notes
DVR cellular status messages
“modem signal drops, errors and does not reconnect” means signal is poor or no signal. so please double check if the sim card is well plug and with antenna and data there.
Engineer said there is an procedure when connect with cellular :
KO ERR -> OPEN ERR ->SIM/CPIN ERR -> CSQ ERR > CREG ERR> APN ERR ->DAILING ERR -> GET IP ERRor -> Success.
If there is any error, the status will go back to KO ERR, so could you take a picture of the last status where DVR goes back to KO error, then will be able to know the last failure spot.
LAN connection to D8
Set D8 IP address
configure a static IP (192.168.0.250 is set in our config file)
If IP not set by config file then: Open dvr display interface, revise the info in LAN interface (IP, Mask, Gateway, MAC) click OK to exit
Set computer to correct network segment (192.168.0.10)
1、connect DVR with network: dvr and computer in the same router or directly connect DVR to the computer. Computer and dvr should be in the same network segment.
2、Run cmd, see if you can ping the IP just set in DVR
If it works, You can continue to enter the command:
Telnet in DVR
Turn on Telnet Client in Windows 10 : Control Panel> Programs> turn windows features on or off
telnet 192.168.0.250 or //192.168.0.250 (IP just set in DVR)
(none) login: root
Password: sharpvision
Change UID
Only used if a serial number was duplicated. If you mess with it otherwise the warranty tracking will be messed up with Stonkam.
//After logging in, enter the following command:
echo xxxxxxxxxx > /etc/DeviceUid
//xxx.xxx.xxx.xxx (new uid)
Power off and reboot // reboot is necessary
3, check whether the UID number modified successfully.
4. new UID INFO (for example only!)
SerialNumber: 201035-424-00181 DeviceId: 1802230021 UserName: 201035 Password: 201035 Sever Ip: 183.233.190.23