Difference between revisions of "New Client Implementation Schedule"

From Idrive
Jump to navigation Jump to search
Line 1: Line 1:
 
== Pre Sale Engineering ==
 
== Pre Sale Engineering ==
 
  
 
* Client Personnel
 
* Client Personnel
Line 9: Line 8:
 
** Mechanics
 
** Mechanics
 
** Safety
 
** Safety
 +
** Pre Implementation Engineering w/Support
  
 
+
* Client Locations(qty)
* Client Locations
 
 
** Parking
 
** Parking
 +
*** Facing the AP
 +
*** Distance from PC to AP
 +
*** From Vehicles to AP
 +
*** frequency of Parking
 +
*** vehicles power cut Off?
 
** Types of vehicles
 
** Types of vehicles
 
** Number of Cameras
 
** Number of Cameras
 
** GSMs?
 
** GSMs?
 +
  
 
* Camera Installation
 
* Camera Installation
Line 48: Line 53:
 
** Multiple Access Points needed?
 
** Multiple Access Points needed?
 
*** Additional Hardware
 
*** Additional Hardware
**** additional APs  
+
**** additional APs
 
 
== Sale ==
 
 
 
== Sale ==
 
 
 
== Sale ==
 
 
 
== Sale ==
 

Revision as of 18:55, 27 December 2018

Pre Sale Engineering

  • Client Personnel
    • Day to day contacts
    • Finance
    • IT
    • Fleet
    • Mechanics
    • Safety
    • Pre Implementation Engineering w/Support
  • Client Locations(qty)
    • Parking
      • Facing the AP
      • Distance from PC to AP
      • From Vehicles to AP
      • frequency of Parking
      • vehicles power cut Off?
    • Types of vehicles
    • Number of Cameras
    • GSMs?


  • Camera Installation
    • Client install
    • Idrive Install
    • Train the Trainer
    • Other?


  • Access Point location
    • Or Cellular only
    • Or Cellular and Access Point mixed
    • Multiple Access Points needed?
      • Additional Hardware
        • additional APs
        • cables
        • length of needed cables
        • multi-port switches
        • High Power PoE(s)
        • WiFi Bridges


  • Base Station requirements
    • larger HDD
    • Terminal
      • Download Point


  • Access Point location
    • Or Cellular only
    • Or Cellular and Access Point mixed
    • Multiple Access Points needed?
      • Additional Hardware
        • additional APs