1. Download the file idr_conf_040914 from the WiKi
+
1. Download the file [[media:idr_conf_040914.zip|idr_conf_040914]] from the WiKi
  
 
2. Open the zipped file and drag the file idr_conf_040914.rsc from the folder to your desktop
 
2. Open the zipped file and drag the file idr_conf_040914.rsc from the folder to your desktop

Revision as of 22:40, 15 April 2014

About the Groove Product

The Groove is made by Microtik. It has many more features than the Ubiquity bullet which is at end of life for the G only version. The groove can be a direct replacement for the bullets in our current wireless environment and will facilitate our transition to 802.11n and perhaps 5Ghz (provided an embedded Dual Band Wifi module can be identified for the X1P/X2/Merge products). See discussion section at the end of this wiki.

Sources & Component notes

RB/GrooveA-52HPn

  • 2.4 or 5.8Ghz Operation
  • Level 4 RouterOS license
  • 6dBi 2.4GHz omni

Also will require:

  • POE adaptor (one supplied will not work well outdoors) here is an example.

http://www.titanwirelessonline.com/MikroMAX-24V-PoE-with-LED-p/pe-24vs-max.htm


  • Tape to seal Antenna coupling
  • 5.8Ghz antenna for operation in that band. Looking for combo 2.4/5.8 anttenna

http://www.balticnetworks.com/mikrotik-groovea-52hpn-2-4ghz-or-5-875ghz-access-point.html

Initial Configuration Setup

Set up Groove Router for initial configuration

Document the "E and W;" MAC addresses from the back of the unit. To be logged in Admin Center under the customer location.

The E is the Ethernet MAC address; the W is the Wireless MAC address

In the Control Center under Settings>Router Settings the W MAC address will show up in as the connected WiFi device that is transferring the events from the cameras

Connect to power (use either supplied AC Adapt or POE injector)

Connect cat 5 cable from Groove to PoE; then from PoE to the Idrive Wireless NIC in the computer

  • Change settings for wireless NIC on your computer to:
-192.168.88.10
-255.255.255.0

<br\><br\>

Connect using Winbox

Download and install Winbox Configuration tool for RouterOS.

Run Winbox.exe or double click the icon on the desktop

Winbox icon.jpg Rb2011 initial login.jpg

  • Enter the Default "Connect To" IP Address: 192.168.88.1
  • Login: admin
  • password: blank
  • Click "Connect"

Upon initial log in the "RouterOS Default Configuration" pop-up window will appear. Choose "OK". We are not concerned about the default settings because they will be overwritten with the idrive default configuration file.

Rbgroove initial login.jpg

Create a backup of the default configuration just in case

Files >Backup

Rb backup default config.jpg

<br\><br\><br\><br\>

Upgrade OS and Firmware

Obtain the latest versions (V6.x) from the MicroTik [|download] site

Click on the correct link for the hardware architecture (mipsbe for RB Groove)

Click on "All Packages" and click Save

Rb2011 downloads.jpg


Extract all of the files from zip package

Copy the files from your computer to the Router Board by dragging and dropping all of the files into the files list in the WinBox window

Rb2011 upgrade files list.jpg Rb2011 upgrade files list2.jpg

Update the firmware System> Routerboard : Upgrade

Rb2011 system reboot.jpgRbgroove firmware updated.jpg

Restart the router and log back into the router and confirm that WinBox shows the new version of RouterOS and Firmware



**STOP HERE** and load idr_conf_040914.rsc from the instructions directly below

This is an Auto Reset that loads when the system is reset!

1. Download the file idr_conf_040914 from the WiKi

2. Open the zipped file and drag the file idr_conf_040914.rsc from the folder to your desktop

3. Open the Files location from Winbox and drag the idr_conf_040914.rsc file to the files holder on the RB Groove

  1. With the updated Routerboard now at 6.11 or higher
  2. Open Winbox and reconnect to Groove (should still be 192.168.88.1, no password)
  3. Select System>Reset Configuration
  4. Check the box “no default configuration” in “Run After Reboot” select the config file name “idr_config_040914.rsc”
  5. Click the button "Reset Configuration"

After the system restarts

  1. Log in and check system at 192.168.0.1


<br\><br\>

**STOP HERE** below are manual configurations, step by step

About RouterOS Configurations

The router board OS can support the traditional Idrive access point configuration:

  • SSID Bwifi
  • IP address and Network Mask
  • 802.11g only

The Router OS also can support more advance features that are coming with the Idrive X2 and Merge products:

  • 802.11n
  • Encryption
  • 5Ghz band support???

Make sure you are selecting the correct default configuration file for the correct environment.




Set Timezone for customer location

Set the timezone. The Date and time will be set by NTP (Network Time Protocol) when connected to the internet

Rb751 timezone.jpg

<br\><br\>

Advanced Configuration (no config file)

<br\><br\>

Interfaces configuration

bridge-local makes the ether1 and wlan1 interfaces work as one

Rbgroove interfaces.jpg

<br\><br\>

WLAN configuration

Return on "Interface List" double-click "wlan1", select "Wireless" tab and complete the fields as in picture.


Rbgroove wlan conf.jpg

<br\><br\>


Bridges configuration

Select "Bridge" from the left menu and add new bridge. Configure the two bridges as shown.

for "bridge_tunnel" Make sure the "ARP" is disabled and enter the MAC Address: 00:00:5E:80:01:01 then select "STP" tab and check "Protocol Mode: rstp".


Rbgroove bridge1.jpg

Rbgroove bridge2.jpg

select "Ports" tab and add interfaces to the proper bridge as shown

Rbgroove bridge ports.jpg

<br\><br\>

Addresses configuration

Rbgroove address.jpg

<br\><br\>

Routes configuration

Add/Modify the route

Rbgroove route.jpg

route <192.168.0.0/16> - routes 192.168.x.x (events) traffic through the tunnel to the base station.

<br\><br\>

NTP configuration

Network Time Protocol - keeps the time syncronized

Rb751 ntp settings.jpg

<br\><br\>

Set Password

Set the password to idrive#

Rbgroove password.jpg

<br\><br\>

Troubleshooting / Monitoring

<br\><br\>

Wifi tools / channel selection

View transfer activity

Rbgroove transfering1.jpg

View other Wifi in the area

Rb751 wifi Scanner.jpg

Note: Channel 1, 6 and 11 are now referred to by their frequency as follows:

Channel 1 = 2.412 - RB Groove Channel reference is 0

Channel 6 = 2.437 - RB Groove Channel reference is 5

Channel 11= 2.462 - RB Groove Channel reference is 10

View the amount of traffic on each channel

Rb751 wifi frequsage.jpg


Rb751 wifi sniffer.jpg


Rb751 wifi Snooper.jpg

System Health

Rbgroove sys health.jpg

<br\><br\><br\><br\>

Discussion here about migration plan to encryption & 802.11n.

Modules

VNT9271B6050 Specifications

the one we currently plan on using

http://www.viaembedded.com/en/products/DatasheetPreview/1891/16443/VIA_VNT9271_datasheet_v130306.pdf.html

1T1R only

No support for 5Ghz

Operating Temp 0C - 55C (32F - 131F)

Humidity 10% - 90% non-condensing

802.11 n single band modules

Ralink RT3572 (2T2R)

http://www.alibaba.com/product-detail/802-11a-b-g-n-USB_135218952.html

Ogenray

http://ogemray.en.alibaba.com/product/1103475630-215317361/2_4G_5G_embedded_300Mbps_2T2R_dual_band_USB_wifi_module_support_soft_AP_mode.html

EWM-W129P (2T2R)

http://www.advantech.com/products/EWM-W129P/mod_DC9EE11C-7FFA-4311-8F37-184934465E02.aspx


Dual Band Possibilities?

EWM-W149P01E - Ralink RT5572 2T2R

http://www.advantech.com/products/EWM-W149P/mod_0A352CDE-CDEB-4F99-8146-C543E8140AC1.aspx

WUBR-506N - Sparklan - End of Life per Sparklan

http://www.prlog.org/10375003-sparklan-wireless-11n-dualband-usb-module-enabling-wireless-connections.html


Please refer to below quotation for WUBR-508N(M4W),

Sample price: USD30 each/ under 100pcs

USD21 @101~499pcs

USD18.5 @500~999pcs

USD17 @1K per shipping lot

5.8Ghz only Possibilities?

Migration Plan to 802.11n

Existing installations

-configure the Grove in the same way as the bullets (G-only etc)

Mixed installation (X1, X1P, X1P with new Wifi, X2)

Basically adding an entire second wifi network with no overlap for existing customers adding X2 to their fleets

  • keep existing 802.11g APs and add separate 802.11n APs
  • Groove in 802.11n Only
  • 5ghz band to eliminate conflict with 802.11g 2.4ghz devices - VNT9271 does not support 5Ghz
  • also change SSID away from bwifi
  • Encryption

802.11a/n only locations

Full on 802.11a/n with all of the tricks (Greenfield Deployment)

http://www.wildpackets.com/resources/compendium/wireless_lan/802_11n

Groove is probable not the best choice. Look into :

http://www.balticnetworks.com/mikrotik-ap-high-powered-802-11n-2-4-5ghz-indoor-outdoor-access-point.html

http://www.amazon.com/Mikrotik-Wireless-Outdoor-OMN5HND-802-11a/dp/B006K26ZFG

http://www.balticnetworks.com/mikrotik-omnitik-upa-5hnd-5ghz-access-point-with-poe.html?gclid=CL_prpqI27sCFVFgfgod6DgA3Q

http://www.balticnetworks.com/ubtiktm-5-875ghz-gigabit-mimo-mikrotik-access-point-for-ubiquiti-antennas.html


  • MIMO (Multiple Input, Multiple Output)-VNT9271 does not support
  • 5Ghz Band (less clutter)-VNT9271 does not support
  • 40mhz channel width (Channel Bonding)
  • encryption
  • Change bwifi
  • more stuff
  • more stuff