Difference between revisions of "New Client Implementation Schedule"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| Line 11: | Line 11: | ||
| − | * Client Locations(qty)  | + | * Client Locations (qty)  | 
** Parking  | ** Parking  | ||
*** Facing the AP  | *** Facing the AP  | ||
Revision as of 19:04, 27 December 2018
Pre Sale Engineering
- Client Personnel
- Day to day contacts
 - Finance
 - IT
 - Fleet
 - Mechanics
 - Safety
 - Pre Implementation Engineering w/Support
 
 
- Client Locations (qty)
- Parking
- Facing the AP
 - Distance from PC to AP
 - From Vehicles to AP
 - frequency of Parking
 - vehicles power cut Off?
 
 - Types of vehicles
 - Number of Cameras
 - GSMs?
- Cellular Download
 - Tracking (Live Look In) only
 
 - Driver ID?
 - Facial Recognition
 
 - Parking
 
- Camera Installation
- Client install
 - Idrive Install
 - Train the Trainer
 - Other?
 
 
- Access Point location
- Or Cellular only
 - Or Cellular and Access Point mixed
 - Multiple Access Points needed?
- Additional Hardware
- additional APs
 - cables
 - length of needed cables
 - multi-port switches
 - High Power PoE(s)
 - WiFi Bridges
 
 
 - Additional Hardware
 
 
- Base Station requirements
- Always ON Internet type
 - larger HDD
 - Terminal
- Download Point
 
 
 
- Access Point location
- Or Cellular only
 - Or Cellular and Access Point mixed
 - Multiple Access Points needed?
- Additional Hardware
- additional APs
 
 
 - Additional Hardware
 
 
After Sale Installation procedures
- Order of Installation
 
- Base Station and Internet connection
 - Idrive Support contacted and logged in to configure
 - Access Points(s) Installed and Configured
 
- Employee Introduction
 
- Vehicles
- Vehicle Availability
 - Vehicle Nomenclature
 - Driver Info (if needed)