Difference between revisions of "New Client Implementation Schedule"

From Idrive
Jump to navigation Jump to search
Line 9: Line 9:
 
** Mechanics
 
** Mechanics
 
** Safety
 
** Safety
 +
  
 
* Client Locations
 
* Client Locations
Line 15: Line 16:
 
** Number of Cameras
 
** Number of Cameras
 
** GSMs?
 
** GSMs?
 +
 +
 
* Access Point location
 
* Access Point location
* Multiple Access Points needed?
+
** Or Cellular only
 +
** Or Cellular and Access Point mixed
 +
** Multiple Access Points needed?
 +
*** Additional Hardware
 +
**** additional APs
 +
**** cables
 +
**** length of needed cables
 +
**** multi-port switches
 +
**** High Power PoE(s)
 +
**** WiFi Bridges
 +
 
 +
 
 
* Base Station requirements
 
* Base Station requirements
 +
** larger HDD
 +
** Terminal
 +
*** Download Point
  
 +
 +
* Access Point location
 +
** Or Cellular only
 +
** Or Cellular and Access Point mixed
 +
** Multiple Access Points needed?
 +
*** Additional Hardware
 +
**** additional APs
  
 
== Sale ==
 
== Sale ==

Revision as of 18:48, 27 December 2018

Pre Sale Engineering

  • Client Personnel
    • Day to day contacts
    • Finance
    • IT
    • Fleet
    • Mechanics
    • Safety


  • Client Locations
    • Parking
    • Types of vehicles
    • Number of Cameras
    • GSMs?


  • Access Point location
    • Or Cellular only
    • Or Cellular and Access Point mixed
    • Multiple Access Points needed?
      • Additional Hardware
        • additional APs
        • cables
        • length of needed cables
        • multi-port switches
        • High Power PoE(s)
        • WiFi Bridges


  • Base Station requirements
    • larger HDD
    • Terminal
      • Download Point


  • Access Point location
    • Or Cellular only
    • Or Cellular and Access Point mixed
    • Multiple Access Points needed?
      • Additional Hardware
        • additional APs

Sale

Sale

Sale

Sale