Difference between revisions of "New Client Implementation Schedule"
Jump to navigation
Jump to search
Line 35: | Line 35: | ||
− | + | == Access Point location == | |
** Or Cellular only | ** Or Cellular only | ||
** Or Cellular and Access Point mixed | ** Or Cellular and Access Point mixed |
Revision as of 19:10, 27 December 2018
Pre Sale Engineering
- Client Personnel
- Day to day contacts
- Finance
- IT
- Fleet
- Mechanics
- Safety
- Pre Implementation Engineering w/Support
Client Locations (qty)
- Parking
- Facing the AP
- Distance from PC to AP
- From Vehicles to AP
- frequency of Parking
- vehicles power cut Off?
- Types of vehicles
- Number of vehicles per location
- GSMs?
- Cellular Download
- Tracking (Live Look In) only
- Driver ID?
- Facial Recognition
Camera Installation
- Client install
- Idrive Install
- Train the Trainer
- Other?
Access Point location
- Or Cellular only
- Or Cellular and Access Point mixed
- Multiple Access Points needed?
- Additional Hardware
- additional APs
- cables
- length of needed cables
- multi-port switches
- High Power PoE(s)
- WiFi Bridges
- Additional Hardware
- Base Station requirements
- Always ON Internet type
- larger HDD
- Terminal
- Download Point
- Access Point location
- Or Cellular only
- Or Cellular and Access Point mixed
- Multiple Access Points needed?
- Additional Hardware
- additional APs
- Additional Hardware
After Sale Installation procedures
- Order of Installation
- Base Station and Internet connection
- Idrive Support contacted and logged in to configure
- Access Points(s) Installed and Configured
- Employee Introduction
- Vehicles
- Vehicle Availability
- plan on 45 min average install time (per installer)
- Vehicle Nomenclature
- Weights
- Driver Info (if needed)
- Vehicle Availability