Difference between revisions of "New Client Implementation Schedule"
Jump to navigation
Jump to search
| Line 9: | Line 9: | ||
** Mechanics | ** Mechanics | ||
** Safety | ** Safety | ||
| + | |||
* Client Locations | * Client Locations | ||
| Line 15: | Line 16: | ||
** Number of Cameras | ** Number of Cameras | ||
** GSMs? | ** GSMs? | ||
| + | |||
| + | |||
* Access Point location | * Access Point location | ||
| − | * Multiple Access Points needed? | + | ** Or Cellular only |
| + | ** Or Cellular and Access Point mixed | ||
| + | ** Multiple Access Points needed? | ||
| + | *** Additional Hardware | ||
| + | **** additional APs | ||
| + | **** cables | ||
| + | **** length of needed cables | ||
| + | **** multi-port switches | ||
| + | **** High Power PoE(s) | ||
| + | **** WiFi Bridges | ||
| + | |||
| + | |||
* Base Station requirements | * Base Station requirements | ||
| + | ** larger HDD | ||
| + | ** Terminal | ||
| + | *** Download Point | ||
| + | |||
| + | * Access Point location | ||
| + | ** Or Cellular only | ||
| + | ** Or Cellular and Access Point mixed | ||
| + | ** Multiple Access Points needed? | ||
| + | *** Additional Hardware | ||
| + | **** additional APs | ||
== Sale == | == Sale == | ||
Revision as of 18:48, 27 December 2018
Pre Sale Engineering
- Client Personnel
- Day to day contacts
- Finance
- IT
- Fleet
- Mechanics
- Safety
- Client Locations
- Parking
- Types of vehicles
- Number of Cameras
- GSMs?
- Access Point location
- Or Cellular only
- Or Cellular and Access Point mixed
- Multiple Access Points needed?
- Additional Hardware
- additional APs
- cables
- length of needed cables
- multi-port switches
- High Power PoE(s)
- WiFi Bridges
- Additional Hardware
- Base Station requirements
- larger HDD
- Terminal
- Download Point
- Access Point location
- Or Cellular only
- Or Cellular and Access Point mixed
- Multiple Access Points needed?
- Additional Hardware
- additional APs
- Additional Hardware