Global Center3 User's Manual

From Idrive
Jump to navigation Jump to search

About the Idrive Global Center3

New Features and Benefits start with a brand new sign-in page

and is found at the same location as before

http://globalcenter.idriveglobal.com

01.Sign in.JPG










Note a User Account must be created and permissions set on the Idrive Control Center Software

  • see Control Center>Fleet Manager>Personnel... to add or change permissions for User Access

















Idrive Global Center3 - Dashboard

02.dashboard.JPG

Dashboard

  • Company Summary
  • Events Summary
Pie-charts are clickable links; shortcut to Events selection
  • Drivers Summary
  • Devices/Vehicles Summary
Pie-charts are clickable links to flyout data display

Locations

03b.locations flyout.JPG

- Multiple company locations equipped with Idrive Base Stations, each will be listed as a separate select-able location from the left tab Flyout

- Multiple company locations equipped with Idrive Download Points, then all vehicles will be listed at the single Target Point location (Main Station)

    • Note: You can sort by department later in Events>Advanced search














Idrive Global Center3 - Events

10.events.JPG

Events

  • Locations Sort
  • Advanced Search
  • New Events
  • Incidents
  • Reviewed
  • ALL Events





















Locations Sort

Advanced Search

11.events flyout.JPG

12b.events advanced search.JPG

New Events

Incidents

Reviewed

ALL Events


GPS Tracker

  • Subscription Service
    • Requires Idrive GSM (Ground Station Module)
    • Live tracking up to 2 minute intervals
    • Live Look-In (20 Look Ins per month/per vehicle;5 seconds each)


Reports

Configure




































































13.events search department.JPG

















14.events search vehicle.JPG

















15.events search driver.JPG

















16.events search device.JPG

















17.Event search event type nested.JPG

















18.Event search review type nested.JPG

















20.Event play.JPG

















21.Event play review.JPG

















22.Event play incident select.JPG

















23.Event play incident nested behaviors.JPG

















24.Event play incident email.JPG

















25.Event play incident download.JPG

















27.Event play GForce Chart.JPG

















28.Event play Speed Chart.JPG

















26.Event play incident print.JPG


















30.GPS tracker.JPG
31.GPS tracker location flyout.JPG
32.GPS tracker vehicle location.JPG
33.GPS tracker vehicle Events.JPG
34.GPS tracker vehicle routes.JPG
35.GPS tracker operations.JPG
36.GPS tracker Alerts.JPG
40.Reports.JPG
41.Reports idle summary.JPG
42.Reports miles.JPG
50.Configure.JPG
51.Configure add a driver manual.JPG
53. Settings.JPG
54.Configure remove a driver.JPG
52.Configure add a driver.JPG