Admin Account

User Names are case sensitive

Default user name admin

Default password 123


Change admin to: IDRIVE Need to verify when we receive another D8. I do not want to lock us out of the only one we have.

Password: IdrD8 Is this OK?


Guest Account

The Guest account limits Menu Access to Playback and Volume only

Default "Guest User name : guest

Default Guest Password: 321

Change Guest to: bnsf

Password: 249805 (SB street address and area code)


Routine Setup

Create Traveler


Install Batteries in Remote Control


Install and Format Hard Drive

Click on the Floppy Disk Icon on main display

Hard Disk Installation Detail

Format Hard Disk Detail

Wait for a format successful message. (this should take approximately 5 minutes for a 500GB hard drive)


Upgrade Firmware and Verify

Get current version from AC

Upgrade Firmware

Verify Version


Install Config File for vehicle type (Handler or Crane)

Config Detail

Stonkam BNSF Crane Config File

Stonkam BNSF Loader Config File


Install SIM Card Installation

SIM Card Installation


Set device/vehicle specific settings (tag device with vehicle number) (document on traveler)

License No. (vehicle name)
Device No. (DVR Serial number) (EX: 4241730)
Time Zone – verify time correct for that zone
Anything else specific to this one device?

Save Configuration to hard drive

If saved to the hard disk the disk might get moved to a different vehicle.

Add an SD card to the system for this purpose? - SD Cards will not format at this time

Rename the config file so it does not get deleted if imported


Labels

Idrive Sticker In/On security Box (Advertising)
Label on top of DVR showing (So Installer and Customer can identify the device for support)
Vehicle Name
DVR S/N – (424)and the 4 digits on the unit example: 4241730
SIM S/N
Download (template requires Zebra Designer software to open)

Remove Film from Door Window

There is a protective film on the front door to protect the plastic


Mount DVR into the Security case for shipping

Mount in Security case for shipment


Pack DVR For shipping

Place 44Pin Cam Cable, Power cable, GPS/3G Antenna, Remote, DVR Keys, Security Box Keys in a box
Label the outside of the box with the vehicle name


Enter DVR into Admin Center

Set Warranty Date
Document SIM Number

Assign (name) SIM In Podsystems (Activate when and by who?)

Kit the other items for the vehicle (Cameras, Cables)




Main Menu

The Main Menu is Displayed by pressing Menu on the remote. If using a touch screen touch the bottom half of the screen. Entering any of these menus will stop the device from recording.

Stkm main menu.jpg
1)**Manually Control - Record, Play, Stop, FF, RW
2)**Playback - Search by date & Time
3)**Logs - System & Export Logs
4)*Display Mode - Switch Grid view from Channels 1-4, 5-8 or 1-8
5)**Configuration Settings - Record,Display, Network & System settings
6)**Storage - Manage SSD, SD, USB
7)**Volume - Playback Volume









Manually Control


Playback

Stkm search videos.jpg

A date marked in green indicates that there were videos recorded that day.

Click the day to view the list of enter the video files for that date

Choose the desired video and press the Play button.

You can play single or multiple videos
Multiple videos can be played in sequence and can shift into the next or the previous one.











Select and Play Videos

Stkm search videos2.jpg
Normal
Event
Capture
Play
All
Exit

AL, I think "Capture" can be used to save the video to USB Stick. Might become more practical than swapping the hard drives. I have not tested this.











Logs

Stkm logs.jpg

Used to keep a log of events in the system

Navigate to Menu->Setup->Log












System Log

Stkm system log check.jpg


Feature allows you to search the Systems Log of events on the machine

Video Loss not shown in Syslog? Also no "Fault" light












Export Log

Stkm export log 2.jpg

Use this feature to export the system log.
Log can be exported to SSD, SD, USB















Configuration Settings

Record

Stkm record settings.jpg
  • Power On Rec ON
  • Cyclic Rec. - Overwrite? ON
  • Event Rec. OFF
  • Event Duration - 15 Seconds
  • File Length - 15 Minutes
  • Motion Sensitivity - OFF
  • G-Force Sensitivity - OFF
  • File Type - AVI



Video Quality

Main Stream
Stkm video quality main.jpg

Resolution: D1(NTSC)

Bit Rate: 2Mbps

Frame Rate: 20fps


Sub Stream


Resolution: CIF(NTSC)

Bit Rate: 64Kbps

Frame Rate: 20fps


JPG

Frame Rate: LOW


Record Channel

Stkm Record Channel.jpg

Green means channel is enabled to record.

Loaders use channels 1,2,3,4

Cranes use channels 1,2,3,4,5,6,7,8


Display

Stkm display settings.jpg

*Camera - Brightness, Contrast Etc for each Camera

*Cam Name - Name of Channel on Display

*Language - Set system Language

*Audio Out - Select Channel Audio to listen to

*Camera - Brightness, Contrast Etc for each Camera

*OSD - On Screen Display Information

*Menu On - How lon Menu is Displayed before logout

*Speed - Speed Settings

*GPS - GPS Location Information

*Mirror - Mirror the Camera Image



Camera

Stkm Cam name 1.jpg

Individual Camera settings:

  • Brightness
  • Contrast
  • Saturation
  • Hue







Cam Name

Stkm Cam name 3.jpg

Each camera has its own channel with its own "channel name".

Navigate to the display tab by hitting Menu->Setup->Display


Choose which camera name you would like to change by selecting its associated channel name. (8 letters max)










Loader Cam Names
  • CH1 - suggest: CAB
  • CH2 - suggest: R-Front
  • CH3 - suggest: L-Front
  • CH4 - suggest: Rear


Crane Cam Names
  • CH1 - suggest: CAB
  • CH2 - suggest: L-Front
  • CH3 - suggest: R-Front
  • CH4 - suggest: Far-Side
  • CH5 - CH8 - suggest: ?????? Need names for these


Language

Stkm Language selection.jpg

To edit the language of the device access Menu->Setup->Display->Language

Select which language you want from the buttons presented. Languages available are English, French, German, Russian, Japanese, Italian, Austrian












Audio Out

Stkm Audio out.jpg

This setting edits the output for the audio channel in split mode

Navigate to this setting by selecting Menu->Setup->Display->Audio Out

Select which camera's audio you would like to output.









OSD

Stkm OSD settings.jpg

OSD controls what information gets overlayed on the video of each camera.

Navigate to this setting by selecting Menu->Setup->Display->OSD

  • Time - ON
  • License - ON
  • Camera Names - ON







Menu On

Stkm Menu on settings.jpg

Sets the duration of time the menu will display on the screen.

Navigate to this setting by selecting Menu->Setup->Display->Menu On

Settings: 30, 60, 120 seconds, or always on. ::*Time - 60 Seconds









Stkm Menu lock setting.jpg

The menu lock setting will lock the menu to be password protected.

A password is needed to change this setting

  • Menu Lock - ON






Speed

Stkm speed setting.jpg

Allows you to change the source of the displayed speed to either the GPS or the vehicle speedometer as well as the units of speed to be either kph or mph


Navigate to this setting by selecting Menu->Setup->Display->Speed











GPS

Stkm GPS settings.jpg

Displays information of latitude/longitude, detectable satellites, connected satellites, speed, and time

Navigate to this setting by selecting Menu->Setup->Display->GPS











Mirror

Stkm Mirror Cam.jpg

Mirrors the video output on the selected camera. Configurable to each camera

Navigate to this setting by selecting Menu->Setup->Display->Mirror











Network

Stkm network settings.jpg

*Lan - Lan Settings

*Wifi - Wifi Settings

*Cellular - Cellular Settings

*Status - Networks Status

*Server - Server Settings

*FTP - FTP Settings







LAN

Stkm network lan.jpg

Defaults:

IP Address 192.168.100.188 set to 192.168.0.250
Mask 255.255.255.0
Gateway 192.168.100.1 set to 192.168.0.1
MAC Add: 7e:97:15:xx:xx:xx



Notes:

I can ping it but not login. There does not appear to be any access from the network only connectivity with a local server



WiFi

Stkm network wifi.jpg

N/A - Optional














Cellular

Stkm network cellular.jpg

Help, this is not working!!!

Default Port is 9090, What do we need for LTI?

I set the port 6608 to test with newdvr.idriv...

  • Cellular - ON
  • Standard - WCDMA
  • APN - data641003
  • Access No. - *99#
  • User Name - BLANK
  • Password - Blank





Status

Stkm network status.jpg

Displays information on:

Lan IP address
MAC Address
3G/4G Network Status
3G/4G Signal Strength
Wifi Network Status
Wifi IP Address
Wifi Signal Strength
Server Status
Network Connectivity



Server

Stkm network server.jpg

I need the server settings for LTI!!!

Note: Server IP will not take a name, it needs an IP address

From Stonkam 8/11/17: "Good idea, we will add DNS function soon"


Server IP: HELP!

Port: HELP!









FTP

Stkm network ftp.jpg

















System

Stkm system settings.jpg

*User - User Password

*Device - Vehicle, Device, Path information

*Date & Time -

*Schedule - Timed Recording

*Exception - Buzzer On/Off and duration

*Acc -

*Alarm -

*Update -

*Config -

*Info -



User

Stkm system usr.jpg













Device

Stkm system device.jpg

Which gets set for alerts? License or Vehicle?

License No. - Default:(AAAAAA) Set to Vehicle Name

Device ID - Default:(BBBBBB) Set to Device Serial number? Example 4241730

Path No. - Default (CCCCCC) What is this?

From Stonkam 8/11/17 "it is a feature reserved for adding bus number in the future if the customer needs"









Date & Time

Stkm system datetime.jpg

Set for customer location











Schedule

Stkm system schedule.jpg

Used to schedule up to 4 recording tasks.

Recording settings include a start & end time as well as day of the week to record.

Note: Recordings are permitted to overlap











Exception

Stkm system exception.jpg

Settings to configure a buzzer when certain errors occur.


Example: Buzzer when camera becomes disconnected


ACC

Stkm system acc.jpg

Displays:

Current voltage of the DVR
Shutdown voltage- If voltage < shutdown voltage then dvr shuts down, powers back on only when voltage exceeds shutdown voltage
ACC Delay- Continued recording after ACC is disconnected. Options are 5,10,15 seconds









Alarm

Stkm system alarm.jpg











Update

Stkm FW Upgrade.jpg

Update of Firmware removes all configuration settings!!!

From Stonkam 8/11/17 " Because the firmware is not totally settled for now and we will upgrade it sometimes according to your specifc needs, so it will modify the configuration file when ungrading. after the firmware is sort of settled, it can keep the customer's setting while upgrading "

Process takes ~ 3 Minutes

Ensure you are using the latest FW version (Stonkam Firmware 20170807)

Copy the firmware to USB stick or SD card root directory.

Insert the USB Stick into the DVR.

Either:

  • Reboot the DVR or
  • Navigate to Menu -> Setup -> System -> Update> Hit OK

Wait for Update Success!

Verify that the update was successful by Menu -> Setup -> System -> Info

Compare the current version to the desired version.







Upgrade Notes

Currently, the upgrade package is deleted from the USB stick after the upgrade process is finished. To prevent having to recopy the firmware to the USB stick rename the file.

Example of Firmware Name: “dv424_upgrade_2017xxxxxxxx”

Change Name to : “dv424_upgrade_never_rename”

Step 2:Copy the package to USB disk or SD card root directory, and insert it to DVR.

Step 3:Power off the DVR and reboot it, then it will auto upgrade. Or in the menu Menu -> System -> Update, click OK to confirm to upgrade. Both method can start the upgrade process.

Eric's note: rebooting the DVR with a "never_rename" firmware file inserted will cause the system to loop


Config

Stkm Config update.jpg
Import

Insert the USB with the appropriate configuration file sv_xml.xml in its root directory

Select the import button

Export

Select Export, Select location (SSD or USB or SD)

Saves sv_xml.xml to location




Info

Displays system software version number

Update the picture with the current (new) version


Installed version was:

SYS Version:201705221746
MCU Version: Not shown
UID : 1705080007



Latest Version we received on 8/7/17 is:

SYS Version: 201708070904
MCU Version: 2017080215
UID : 1707270002



Storage

Stkm main storage.jpg


















Filesystem Structure

Log4Gui - ASCII System Log

test_writable - system test if disk read only?

Normal Folder - location where videos are stored

  • 20170801 Folder - separate folder for each date
  • Video files naming example: 20170801150248_NM_0030_0001_1920_1080_25_04194304_AAAAAA_02.avi
  • 2017^08^01^ - Year^Month^Day
  • 15^02^48 - Hour^Minute^Second (from start?)
  • _NM_0030_0001_1920_1080_25_04194304_ Figure this out
  • AAAAAA_02 - Vehicle_Channel


Volume

Stkm volume.jpg

Set the playback volume via the remote. The default volume is 5.
Minimum volume: 1
Maximum volume: 10












Detailed Assembly Instructions

Hard Drive

Hard Disk Installation Detail

Stkm faceplate removal.jpg

Stkm HD Sled Removal.jpg

Step 1: Unlock the device with its key, and open the two side flaps on the front panel. Pull the front plate from the top down as shown.

Step 2: Pull the hard drive sled out by its attached ring


Stkm HD Sled Dissassembly.jpg

Stkm HD Sled Dissassembled.jpg


Step 3: Remove the six screws that hold the hard drive sled together carefully with a screwdriver. Once these screws are off the whole bottom plate should be removed.


Stkm SupportShelf Disassembly.jpg

Stkm HD Install.jpg

Step 4: Remove the two screws on the silver hard drive support shelf. Once these are removed pull the top of the shelf up as illustrated.


Stkm HD Installed.jpg

Stkm HD Screw install.jpg




Step 5: Slide the new hard drive into the enclosure making sure a solid connection is made with the hard drive.

Step 6: Fold the hard drive shelf back down into its resting position and secure the 4 hard drive mounting screws in place. These hard drive mounting screws come from the device's accessory pack


Stkm HD SupportShelf secure.jpg

Stkm HD Sled Assembly.jpg



Step 7: Lock the hard drive shelf into place with the 2 securing screws from step 4

Step 8: Reinstall 4 Hard drive Sled screws that secure its bottom panel.


Stkm HD Sled Install.jpg

Step 9: Slide hard drive sled back into the D8 securely



Format Hard Disk Detail

Format SSD (15 seconds for 500GB)


Stkm DiskFormat Menu.jpg


Press the orange floppy disk icon to access the disk management settings









Stkm DiskFormat Selection.jpg


Select which disk you would like to format.

Note once formatted all data on this disk will be lost








Stkm DiskFormat Completion.jpg


Acknowledge that you would like to proceed with the format.

Wait for a format successful message. (this should take approximately 5 minutes for a 500GB hard drive)








SIM Card Installation

Push the Eject button (shown in yellow) to the left of the SIM Slot with a pen and remove SIM Tray

Stkm sim removal diagram.jpg

Stkm sim tray removal.jpg





Document SIM Number and Insert SIM Into Tray Such that it sits flush with the plastic tray

  • Note: Sim is held in under tension by plastic wedges inside the tray

Insert Tray into System, ensure it clicks in.

Stkm sim tray insertion 2.jpg

Stkm sim tray installation.jpg



Firmware Versions Changes/Notes

Aug 8th 2017

Server address will not take a name only an IP address

SD cards will not format

Configuration is lost when firmware updated

Video Loss does not create a syslog entry or turn on the fault LED