CMS Server documentation

From Idrive
Revision as of 19:34, 21 March 2017 by Mark (talk | contribs) (→‎Adding)
Jump to navigation Jump to search

AWS Instance

CMSServer_login

dvr.idriveglobal.com

IP 54.210.45.54

Login By:

User Name : Admin

Password: Not shown

Enter the Validation Code

Click Login







Installation

Download Location

Download- https://www.dropbox.com/s/o2qytb6hxdc2clt/CMSServerV7_7.10.0.1_20170112.exe?dl=0

Installation Steps

CMSServer1.jpg CMSServer2.jpg

CMSServer3.jpg CMSServer4.jpg

CMSServer ReadMe.jpg



Configuration

AWS instance shown. I installed this on a local system and changing 54.210.45.54 to 192.168.0.10 everything worked.

CMSServer login server settings.jpg CMSServer gateway server settings.jpg



CMSServer user server settings.jpg CMSServer media server settings.jpg



CMSServer storage server settings.jpg CMSServer download server settings.jpg



Ports

These ports need to be open at the server site? Not at the client because we use 3G?

  • Login Server 6606(Device) 6605(Client)
  • Gateway Server 6608(Device) 6607(Client)
  • User server 6601(Device) 6603(Client)
  • Media Server 6602(Device) 6604(Client)
  • Storage Server 6612(Device) 6611(Client)
  • Download Server 6610(Device) 6609(Client)



Server Manager Open

Start>Programs>CMSServerV6>CMSServer Control

CMSServer control panel.jpg



Vehicles / Devices / SIMs

You must have a "Device" (D8) created before adding a vehicle. If the Device has a SIM it should be added to the "Device since that is where it is installed. When you create a Vehicle you add the Device to it. To change the Device or Vehicle after the fact you need to delete the Vehicle and the the Device and add them back in.



Adding

SIMS

You can pre-populate N-Number of SIMS and they do not need to corrialate to the number of devices.

CMSServer add sim.jpg



Devices

Enter the following information

  • Device No. (use the last 6 digits from the serial number on the D8)
  • Company - Select using the Pulldown
  • SIM No. - Select from the list of SIMs (Click in the empty box for a list)
  • Device Serial No. - user the same number as in Device No.

CMSServer add device.jpg

Click on "Operate" to select the SIM

CMSServer select sim.jpg



Vehicles

THis information will be modified once we have details on the vehicles and what device is installed in them

Enter the following information

  • Plate No. - For initial Vehicle creation use the Device No. Thsi will be modified with vehicle name when received from the customer/installer
  • Company - Select company from the Pull-down (if known)
  • Device No. - The Device that is installed in this vehicle.

CMSServer add Vehicle.jpg

Click on "Operate" to select the Device

CMSServer select device.jpg



Deleting

Deleting a Vehicle Deletes the assigned device!




Alarms

View Alarms

Click on the "Video" Icon at the top:

CMSServer_video_icon



Select "Alarm Info" below the viewing area and click "View":

CMSServer_alarm_info



Set Start and End Date/Times

Select "Terminal" (Vehicle) All or individual

Click on "Query":

CMSServer_alarm_select



Populated Alarm List:

CMSServer_alarm_results