New D4M (4/17/19) Initial Configuration and Setup

From Idrive
Jump to navigation Jump to search

Idrive D4M Configuration


Record Serial Number

D4M Serial Number.jpg

Serial number is located on the bottom of the D4M.

Remove D4M from the Security Box
Record Serial number







D4M Serial Label.jpg
Print Label and afix to the top of the D4M












  • Enter Serial Number into Admin Center.
AC> Manufacturing >D4-DVR Production Tab
Click on ADD and enter the S/N
Select Item Type IDRDVRD4HD



Install Hard Drive/SSD

D4M Hard Drive Inst.jpg

Use the 4 screws in the plastic bag with the keys to secure the SSD in the carriage

Install the Hard Drive Sled into the D4M




Setup the D4 for configuration

D4M Front.png
Legend5.png



1)*Plug in a Mouse into the USB port on the left hand side of the Front Panel(no Remote Control with the D4M)







In the Rear Panel>
1)*Plug in the Power Cable
2)*Plug in the Monitor Cable
3)*Plug in the Camera Cable
4)*Turn power supply ON
5)*Turn Key ON
6)*Select Main Menu






px250
1)*Confirm that the Alarm Wire SNR1 (Grey wire below the purple wire on the black Molex plug) triggers Cam Ch#2 to full screen when connecting the Grey wire to 12VDC















Click the Right Mouse Button For Options

D4M Right Click.jpg


1)*Main Menu - DVR Configuration Options
2)*SingleScreen - Display one Camera on the Monitor
3)*MultiScreen - Display all 4 cameras on the monitor
4)*UpScreen - Figure it out
5)*DownScreen - Figure it out
6)*Screen Save - Save the current screen configuration as Default
7)*PTZ





Verify Correct Firmware version

Main Menu> System> System Info

Current Release V206-2019/4/12-10:11:124

Upgrade Firmware if needed

  • Obtain Latest Firmware Version from AdminCenter (if we receive one)
  • Place the Firmware on a SD Card (USB Port is in use for the mouse)
  • Insert the SD card into the DVR
  • Main Menu> System> System Upgrade> Browse and select file and click OK



Import Idrive Default Configuration

  • Obtain Latest Config File from AdminCenter (if we receive one)
  • Place the Config File on a SD Card (USB Port is in use for the mouse)
  • Insert the SD card into the DVR
  • Main Menu> System> Config Operation> Import Configuration Browse and select file and click OK



Verify Config and customize Settings

  • Enter the serial number for the D4M into the “LICENSE ID” Menu> Mobile> Motor> License ID
  • Set the CUSTOMER's Time Zone Menu> Setting> Date/Time> Timezone
  • Set the CUSTOMER's Time Menu> Setting> Date/Time> Set Time
  • Set the CUSTOMER's Daylight Savings Time Menu> Setting> Dst Setting> USA
Note No need to fill in the week day or Hour. USA sets this
  • Turn Key OFF
  • Remove SD Card

Format the SSD / Hard Drive

  • Install the hard drive carriage into the D4M
  • Turn the key ON
  • Format the SSD/Hard Drive Menu> Storage> Disk Info> Format
The Format Button is at the bottom but does not display in AMCAP
  • Push record and verify that it can write to the hard drive.
  • Push stop
  • Test all camera ports with a working camera to ensure that they all work.
  • Turn the Key and Power supply off.
  • Box up unit with serial number on the outside of the box





Main Menu

The Main Menu is Displayed by right clicking the USB mouse .

D4M Main Menu.jpg
1)**Preview - Camera Setting, Motion Setting
2)**Record - Video program, parameters and related configuration
3)**Storage - Hard disk information and formatting
4)**Mobile - Power, motor, GPS, G-sensor etc.
5)**Network - 3G/4G, LAN, Sever related configuration
6)**Setting - User, alarm system parameters, such as configuration
7)**File - The captured image display and operation
8)**System - System info, upgrade management, etc.









Preview

Camera Settings

Each channel set separately

D4m Camera Setting.png
1)*Video Lost Beep - Enable for beep when video is lost OFF
2)* Camera Title - DEFAULT(CH:0#)?
3)*AHD Camera Type - AUTO DETECT
4)*Power Line Frequence - ?
5)*Frame Rate - DEFAULT (30)
6)*FLIP - Mirror horizontal or vertical OFF,OFF
7)*Brightness * DEFAULT (50)
8)*Contrast - DEFAULT (40)
9)*Hue - DEFAULT (50)
10)*Saturation - DEFAULT (50)
11)*Audio Volume - DEFAULT (40)
12)*Auto Black-and-White - At night switch to Black and White mode OFF
13)*FrameRate Down - lower frame rate at night OFF
14)*IR LED Light - Only if supported by the camera AUTO
15)*LED Status Indicator - OFF

Copy To, Apply, Return Buttons not shown in AMCAP


Motion Settings

D4m Motion Setting.png

Each channel set separately

1)*Motion Zone Settings All Clear
2)* Enable Adaptive Bit rate Default
3)* Record when motion detection triggered Default
4)* Alarm Buzzer Default
5)* Sensitivity(0-100) Default(50)
6)* Percent of enabled area required to trigger (0-100) Default(10)












Copy To, Apply, Return Buttons not shown in AMCAP




Record

D4M Record Details.png
1)* Resolution - DEFAULT(BASIC,2/3D1)
2)* Bitrate(Kbps) - DEFAULT(200)
3)* Frame Rate(1-30) - DEFAULT(30)
4)* Real Frame Rate - 30
5)* File Length(Minutes) - 5
6)* Record with Audio - DEFAULT(NO,ALL)
7)* Record Mode - DEFAULT(AUTO)
8)* Size(MBytes/hour) - DEFAULT(710)
9)* Camera Status - DEFAULT(Monitored,OK)
10)* Record Status - DEFAULT(Monitored,Recording)
11)* Stop All Stop - Do not press, unless intending to stop recording.
12)* Record File Encryption - DEFAULT(Blank)




Copy To, Apply, Return Buttons not shown in AMCAP



Record Schedule

D4M Schedule Setting.png
1)* HH:MM HH:MM Leave this section blank - DEFAULT
















Clear, Copy To, Apply, Return Buttons not shown in AMCAP




Storage

D4M Storage Basesetting.png
1)* Overwrite Mode - DEFAULT(Overwrite normal video)
2)* No disk alarm time(seconds)) - DEFAULT(Off)
3)* Normal Record Disk - DEFAULT(sata)
4)* Alarm Record Disk - DEFAULT(sata)
5)* Format - Use Format Only at Initialization of SSD











Format, Refresh, Apply, Return Buttons not shown in AMCAP




Mobile

D4M Mobile Power.png

Power

D4M Mobile Motor.png
1)* Ignition Level - DEFAULT(High)
2)* ACC Power Off Delay(seconds)) - DEFAULT(30,TBD)
3)* Sleep Delay-ACC Off(seconds) - DEFAULT(60,TBD)
4)* Sleep Delay-No Alarm(seconds) - 0
5)* Power On at(HH:MM) - 00:00
6)* Power Off at (HH:MM) - 00:00
7)* Current Voltage - 13.3(monitored)
8)* Power Off Threshold Voltage - DEFAULT(Effect TBD,12.8)
9)* Power On threshold Voltage - DEFAULT(Effect TBD,13.1)


Apply, Return Buttons not shown in AMCAP


Motor

1)* License ID - ENTER S/N
2)* Obtain Speed - DEFAULT(From GPS(If any))
3)* Speed Unit - MPH
4)* Speed Limit - 65
5)* Overspeed Record - DEFAULT
6)* Overspeed OSD - SPD
7)* Overspeed buzzer - Off



Apply, Return Buttons not shown in AMCAP


GPS

D4M Mobile GPS.png


1)* GPS Status - DEFAULT(Monitored, Not Found)
2)* GPS OSD - DEFAULT(On)
3)* GPS Baudrate - DEFAULT(9600)
4)* Sync with GPS time - Check


Apply, Return Buttons not shown in AMCAP








G-Sensor

D4M Mobile G-Sensor.png
1)* Instant Value - DEFAULT(Monitored)
2)* Initial Offset - DEFAULT(0,0,-1 TBD)
3)* Alarm Threshold - DEFAULT(0,0,0 TBD)
4)* Alarm Buzzer - DEFAULT(TBD)
5)* Alarm Record - DEFAULT(TBD)




Correction, Refresh, Apply, Return Buttons not shown in AMCAP










Network

D4M Network 3G 4G.png
3G/4G
1)* 3G/4G Status - DEFAULT
2)* Dial Enable - DEFAULT(Check))
3)* Dial Number - DEFAULT(Blank)
4)* APN - DEFAULT
5)* Username - DEFAULT
6)* Password - DEFAULT


Apply, Return Buttons not shown in AMCAP


D4M Network Wifi.png





WiFi
1)* Enable - DEFAULT(Uncheck)
2)* Mode - DEFAULT(Do not Select)
3)* WiFi Status - Module not found
4)* WiFi IP - DEFAULT
5)* SSID - DEFAULT
6)* WiFi List - SPD
7)* AP Scan - DEFAULT
8)* Signal Strength - DEFAULT
9)* Password - DEFAULT


Apply, Refresh, Return Buttons not shown in AMCAP


D4M Network LAN.png


LAN
1)* DHCP - DEFAULT(Uncheck)
2)* IP - DEFAULT(192.168.0.220)
3)* Subnet Mask Status - DEFAULT(255.255.255.0)
4)* Default Gateway - DEFAULT(192.168.0.1)


Apply, Return Buttons not shown in AMCAP


D4M Network Server Settings.png






Server Settings
1)* Server Status - DEFAULT(disconnected)
2)* Client DVR ID - DEFAULT(S/N)
3)* Server - DEFAULT(192.168.0.128)
4)* Server Port - DEFAULT(10000)
5)* Channel - DEFAULT(1)
6)* Resolution - DEFAULT(640x360)
7)* Bitrate(Kbps) - DEFAULT(100)
8)* Framerate(1-30) - DEFAULT(10)
9)* Talkback Channel- DEFAULT(1)


Apply, Return Buttons not shown in AMCAP


D4M Network GPS Server Settings.png



GPS Server Settings
1)* GPS Network ID - DEFAULT(S/N)
2)* GPS Server IP - DEFAULT)
3)* GPS Server Port - DEFAULT(0)
4)* GPS Server Status - DEFAULT(Disconnected)


Apply, Return Buttons not shown in AMCAP















Setting

D4M Setting Common Setting.png
Basic Settings
1)* Toolbartip Bar Show - Enabe(Check)
2)* DVR Time Display - Enable(Check)
3)* USB Auto Update - DEFAULT(Not checked)
4)* Language Mode - English
5)* GUI Skin - Black
6)* Transparent - Translucent
7)* AHD Camera Num - 4


Apply, Return Buttons not shown in AMCAP






D4M Setting Alarm Setting.png
Alarm Settings
1)* Alarm - Sensor1 1
2)* Trigger Level/Mode - High
3)* Alarm Record - Set
4)* Alarm Snapshot - Set
5)* Alarm OSD - DEFAULT(BACKING) ?
6)* Alarm Buzzer - DEFAULT(On) ?
7)* Switch View - DEFAULT(2) ?
8)* Switch View Delay(Seconds) - 0
9)* Pre-record Time(Seconds) - 20
10)* Post-record Time(Seconds) - 15


Apply, Return Buttons not shown in AMCAP


D4M Setting Date Time.png
DST Settings
1)* Date Format- mm-dd-yyyy
2)* DVR Time - DEFAULT
3)* Set Time - DEFAULT(Input current date and time)
4)* Time Zone - (GMT-05:00) Eastern Time.
5)* Time Offset - 0
6)* DST Period - Yes
7)* DST Setting - USA
8)* From - DEFAULT(User Input)
9)* To - DEFAULT(User Input)



Apply, Return Buttons not shown in AMCAP



D4M Setting Output Setting.png
Output Setting
1)* Output Device - CVBS PAL ?
2)* CVBS Output Volume(0-255) - 16 ?
3)* CVBS Output Reduction Value - 0
4)* ScreenSaver Delay(Seconds) - 0



Apply, Return Buttons not shown in AMCAP

D4M Setting PTZ Setting.png







PTZ Settings


Apply the following to all four channels.

1)* CH:01 - Baudrate 9600
2)* CH:02 - Protocol PELCO-D
3)* CH:03 - Address 0
4)* CH:04 - DEFAULT



Copy to, apply, Return Buttons not shown in AMCAP










File

D4M File.png


File

No Setup needed.
















System

D4M System Info.png
System Info
1)* DVR App Version - V206-2019/4/12-10:11::12-4
2)* DVR MCU Version - 08/04/2018-0d
3)* Camera1 Version - NTSC


Apply, Return Buttons not shown in AMCAP

D4M System Upgrade.png









System Upgrade


1)* Current Version - V206-2019/4/12-10:11::12-4
Confirm Current Version is the latest version; if not, browse available resources for upgrade?
2)* Upgrade file - DEFAULT(Browse)







Upgrade, Return Buttons not shown in AMCAP



D4M System Config Operation.png
Config Operation
1)* DEFAULT - DEFAULT
2)* Import Configuration - DEFAULT ?
3)* Export Configuration - DEFAULT
4)* Restart System - DEFAULT(Use only if changes were made)




Upgrade, Return Buttons not shown in AMCAP

D4M System Log.png







System Log
1)* DISPLAYS LOG - DEFAULT(Refresh only if necessary)





Refresh, Return Buttons not shown in AMCAP