Stonkam D8 Initial Configuration and Setup

From Idrive
Jump to navigation Jump to search

Routine Setup

Login

Default user name admin

Default password 123


SSD Operations

Format

Click on the Floppy Disk Icon on main display

Format SSD (15 seconds for 500GB)

FileSystem windows format not Linux


Filesystem Structure

Log4Gui - ASCII System Log

test_writable - system test if disk read only?

Normal Folder - location where videos are stored

  • 20170801 Folder - separate folder for each date
  • Video files naming example: 20170801150248_NM_0030_0001_1920_1080_25_04194304_AAAAAA_02.avi
  • 2017^08^01^ - Year^Month^Day
  • 15^02^48 - Hour^Minute^Second (from start?)
  • _NM_0030_0001_1920_1080_25_04194304_ Figure this out
  • AAAAAA_02 - Vehicle_Channel


Firmware Upgrade via SD

Insert the SD card with the appropriate upgrade files in its root directory.

Navigate to Menu -> Setup -> System -> Update

Hit OK

Wait for Update Success!

Stkm FW Upgrade.jpg



























Note: To make sure the update was a success reboot the device and navigate to

Menu -> Setup -> System -> Info

Compare the current version to the desired version.




Config Import via USB

First insert the USB with the appropriate configuration file in its root directory

Navigate to Menu -> System -> Config

Select the import button


Stkm Config update.jpg














Hard Disk Installation

Stkm faceplate removal.jpg

Stkm HD Sled Removal.jpg




Step 1: Unlock the device with its key, and open the two side flaps on the front panel. Pull the front plate from the top down as shown.

Step 2: Pull the hard drive sled out by its attached ring




Stkm HD Sled Dissassembly.jpg

Stkm HD Sled Dissassembled.jpg

Step 3: Remove the six screws that hold the hard drive sled together carefully with a screwdriver. Once these screws are off the whole bottom plate should be removed.



Stkm SupportShelf Disassembly.jpg

Stkm HD Install.jpg

Step 4: Remove the two screws on the silver hard drive support shelf as shown below. Once these are removed pull the top of the shelf up as illustrated.















Step 5: Slide the new hard drive into the enclosure making sure a solid connection is made with the hard drive ribbon cable.


Stkm HD Installed.jpg





Step 6: Fold the hard drive shelf back down into its resting position and secure the 4 hard drive mounting screws in place. These hard drive mounting screws come from the device's accessory pack

Stkm HD Screw install.jpg

















Step 7: Lock the hard drive shelf into place with the 2 securing screws from step 4 as shown in the image below

Stkm HD SupportShelf secure.jpg

















Step 8: Reinstall 6 Hard drive Sled screws that secure its bottom panel.

Stkm HD Sled Assembly.jpg

















Step 9: Slide hard drive sled back into the D8 securely

Stkm HD Sled Install.jpg

















Manual Configuration

Main Menu

The Main Menu is Displayed by pressing Menu on the remote. If using a touch screen touch the bottom half of the screen.

Stkm main menu.jpg
1)*Not Sure
2)*Not Sure
3)*Not Sure
4)*Not Sure
5)*Not Sure
6)*Not Sure
7)*Not Sure



Record

  • Power On Rec
  • Cyclic Rec. - Overwrite?
  • Event Rec.
  • Video Quality
  • Record Channel - turn on/off recording for each channel
  • Event Duration
  • File Length
  • Motion Sensitivity
  • G-Force Sensitivity
  • File Type




Display

Camera

Navigate to the display tab by hitting Menu->Setup->Display

Here you can choose which camera's settings you would like to alter. Settings include brightness, contrast, saturation, and hue

Stkm Cam name 1.jpg












Cam Name

Each camera has its own channel with its own "channel name". This is what you will be changing since the cameras are pre labeled cam1,cam2...etc

Navigate to the display tab by hitting Menu->Setup->Display


Choose which camera name you would like to change by selecting its associated channel name. This Name will be displayed at the bottom of the screen on each camera individually. Once the channel is selected a keyboard will pop up, type in the desired name with a maximum of 8 characters and must not be blank

Stkm Cam name 2.jpg













Once you are finished hit escape and check to see if your cameras are correctly named

Stkm Cam name 3.jpg













Language

To edit the language of the device access Menu->Setup->Display->Language

Select which language you want from the buttons presented. Languages available are English, French, German, Russian, Japanese, Italian, Austrian

Stkm Language selection.jpg













Audio Out

To edit the output for the audio channel in split mode navigate to Menu->Setup->Display->Audio Out

Select which camera's audio you would like to output.

Stkm Audio out.jpg














OSD

OSD controls what information gets overlayed on the video of each camera. You can add Time, License Plate Numbers of current vehicle the camera is on, and Camera Names. This is crucial information to clarify video playback.

Stkm OSD settings.jpg













Menu On

Sets the duration of time the menu displays for. This can be set to 30, 60, 120 seconds, or always on. Can also lock the menu to be password protected. A password is needed to change this setting, the default password is 123.

To change these settings navigate to Menu->Settings->Display->Menu On

Select the duration of display on time you need, and toggle the Menu Lock option to change it.

Stkm Menu on settings.jpg













Speed

GPS

Mirror



Network

LAN

Defaults:

IP Address 192.168.100.188
Mask 255.255.255.0
Gateway 192.168.100.1

MAC Add: 7e:97:15:xx:xx:xx


WiFi

N/A - Optional


Cellular

Status

Server

FTP



System

User

Device

License No. - Default:(AAAAAA)

Device ID - Default:(BBBBBB)

Path No. - Default (CCCCCC)


Date & Time

Schedule

Touch

ACC

Alarm

Update

Config

Info