==Sub Assembly Processing==
 
==Sub Assembly Processing==

Revision as of 23:46, 12 December 2014

Copyright Information

This document contains proprietary information that is protected by copyright. No part of this document may be photocopied, reproduced, or translated to another language without the prior written consent of Idrive Inc.



About This Document

This document contains the information necessary to produce a Idrive Main board suitable for building of an Idrive X2 series camera. This includes all programming, testing, focus of lenses and bar code label.




X2 Camera Processing Overview

X2-process-overview.jpg



X2 Main Board Assembly



Assemble PCB

X2 Main Board PCB Assembly Materials
All components as listed in "Idrive X2 REV 1.1 Main Board" Bill of Materials
Pre-printed Bar Code Labels with Serial Number

1. SMT Assembly steps - Use the supplied pick and place information supplied by Idrive Inc.

2. Manual Assembly Steps (Through Hole components etc)

3. Place Barcode label in the S/N box on the PCB next to the Power Connector

X2-driver side assy.jpg X2-road side assy.jpg

Top Level X2 Main Board Assembly

Top Level Main Board Assembly Materials
4GB Pre-Programmed Micro SD card (Contains OS for camera)
8GB Micro SD card (No pre-programming, used for event storage)
2 Lens Holders (11mm Height)
4 Lens Holder screws (2 for ech lens holder)
DSL-218A Lens for Road side of the camera (side of the PCB with the power connector) (the lens for the Road Side of the camera is different from the Driver side of the camera)
DSL-180C Lens for Driver Side of the camera (side of the PCB with the Processor on it) (the lens for the Driver Side camera is different from the Road Side of the camera)
Bar code Labels with Serial number


1. Insert the Pre-programmed 4GB SD card into Complete this. as shown in #1 below

2. Insert the 8GB SD card into Complete this. as shown in #2 below

3. Mount of the two Lens Holders to the board as shown in #3 below

4. Inserting the proper lens in the correct side in the Lens Holders as shown in #4 below (Lenses are glued after programming and focus)

5. Advance the Top Level X2 Main Board PCB assembly to the X2 Programming Station

File:X2-driver side top assy.jpg File:X2-road side top assy.jpg



X2 Main Board Initial Programming

Idrive X2 Programming & Lens Focus Materials
Idrive X2 Programming Station
Idrive Top Level X2 Main Board Assembly
Lens focus targets
Super Glue (for fixing lenses) (Loctite Control, Extra Time or equivalent)




Initialize Programming Station

New X2 programmer picture here

X2 Programming Station Initialization


Setup X2 Main Board

1. Place the Idrive X2 Main board in to the Device holding Fixture.

2. Connect the Power cable between the Idrive X2 Main Board and the Programming Fixture.

3. Connect the ? cable between the Idrive X2 Main Board and the Programming Fixture.

4.

New Pictures of the X2 here

File:X2dutfront.jpg File:X2dutback.jpg

<br\><br\>

Automatic Install

X2fwautoinststart.jpg

1. Click on the Factory-New Devices-Auto button to open The Automatic Install window

2. Scan the Bar Code label with the serial number (if no bar code scanner is available type the serial number from the bar code label into the serial number input field in the Idrive Factory Tools Application)

3. Click on the Auto Install Button and the Automatic Install window will open

X2fwautoinstall.jpg




4.Click on Start Installation Button

The program will automatically step through the programming sequence and report status of each step.
  • Installing Boot Loader
  • Configuring Device
Contacts Admin Center to get settings for the device
Tests Door Wire Event
Tests Panic Wire Event
Tests Alarm Wire Event
Tests GPS External Interface
If any of these steps fail the program will stop and give an error. If all steps are successful the program will enter into Lens Focus Mode.








Lens Focusing

1. Select "Inside Camera" Tab an Focus the Inside camera(Driver Side) (the one on the same side of the camera as the LEDs). The focal length for the inside camera should be ~1.5 meters

2. Select "Outside camera" Tab and Focus the Outside camera (Road Side) (the one on the side of the camera without LEDs). The Focal Length for the outside camera should be as far as possible

3. Once focused fix the each lens with a drop of super glue.

4. Verify that the lenses can not move.

5. Select "Both cameras" Tab and Verify the lenses are focused.

6. If images are focused and clear click on the "Lens Focus OK" button and the focus mode will close. If the image is not clear for some reason click on the "Lens Focus Not OK" the focus mode will exit so corrective action can be taken

7. Remove the assembly from the test fixture and Test the lenses after several minutes to ensure they have taken the glue and cannot be moved

8. Advance the Main Board to the Camera Top Level Assembly Station.













Mark Stopped Here





Sub Assembly Processing

GPS

WiFi

LED Board

Plastic Parts






Top Level Camera Assembly

Final X1 Series Camera Assembly


Idrive X2 Top Level Camera Materials
Idrive X2 Main Board Assembly (Programmed, lenses focused and secured)
Wifi Assembly with Antenna
Idrive X2 IR LED Assembly with Cable
GPS Assembly with Cable
Idrive X2 Plastic case




Device Testing Stage 2 (Wifi, GPS,IR LEDs Shock Event, Transfers)

Need all new programmer information

Note: The Idrive X2 programmer may also be used to perform this portion of the programming provided a wireless router is configured and connected to the system. For better throughput and to reduce the number of wireless networks in a factory environment it is recommended that the x6 Programmer be used. Because this document is intended to support production the x6 programmer process is shown here. See X2 programmer final programming process section in the Appendix for use of the V7 programmer for this portion of the process. -is this all still true?

<br\><br\>

Verify That the IR LEDS are working

Move this to camera assembly section. Show the new LED board and cable connections

1. Put your hand in front of the IR LEDs and verify that you can see the light reflecting in the Inside camera view.

IR LEDs.jpg



Stage 2 Automated Testing Process with x6 Programmer

Still applicable?

1. Initialize x6 programming station

X6fixtswitchesman.jpg

x6 Final Test Station Initialization

2. Connect up to 6 cameras into the x6 programmer using the 6 pin power cables

3. Turn on the power switch of the x6 programmer (applies power to the programmer)

4. Press the "12 Volt On/Off" Button on the x6 programmer (applies +12volts to the Devices)

5. Press any one of the Ignition On buttons (Turns the Ignition on for all of the Devices)

6. When the Device(s) have both lights green shake each camera to generate a shock event Monitor Bi-color LEDs to ensure correct function

7. While capturing the event place your hand in front of the inside lens to verify IR LED Function

7. When both LEDs return to green for all Devices press any one of the Ignition On buttons (Turns the Ignition Off for all of the Devices)

<br\><br\><br\><br\><br\><br\><br\><br\><br\><br\><br\><br\><br\><br\><br\>

Events from the camera download to the Factory Tool and automatically show up in the connections list. When finished downloading the camera(s) will shut off.

Stage2dl704.jpg

8. Verify that each device contacted the test station. (If not there is a problem with the Wifi)

9. Each event should be shown in Green text (Red text indicates a failure). Green indicates the following tests passed:

  • The Device has a valid serial number
  • There was at least 1 event (Shock Event was created)
  • GPS Module is working

9. Press "Play events" link for each event and review the events. Review events for:

  • Focus and Image quality
  • IRLED functioning
  • Verify that the audio is working

10. Disconnect the power cable from the Camera(s)

11. Check the "Final Box" in AdminCenter to make the camera eligible for shipment. Advance the Camera to Shipping

<br\><br\>

Shipping and Device Assignment

Using the idrive admincenter to ship idrive devices from the factory.

Login in with your user name and password to http://admincenter.idrive.pro


Click on shipping

Idrsd1.jpg


Click on ADD to start the process

Idrsd2.jpg


Use the Pull-down fields to select: Company, Location, Quote, Date, Address, Contact, Shipping Company (Tracking Number(s) can be entered later if it is not yet available). Click on "Add S/N" to open the form for device selection.

Idrsd3.jpg

  • We really need the scanner to do this to reduce the errors.

In the device selection form check the box next to the device(s) to be shipped. You can search the list by typing the last 3 characters into the "S/N" box which will highlight the device you are searching for. Once ALL of the devices are selected click on the "X" to close the window.

Idrsd4.jpg


Verify the correct number of IDRX2 units (the other items ship from elsewhere) and Click "Next(Confirm shipping)"

  • New Picture

Idrsd5.jpg

After Confirmation a Shipping form will come up. This should be printed and included with the shipment of the devices to the customer.

  • New Picture

Idrsd6.jpg


Select the "Shipping List" Tab. If you need to add tracking information you must do it before closing out the shipment using the edit button. Select "Close" to assign the cameras to the customer as well as send the automated notification of the shipment to the people on the distribution list. The "Close" process will be performed by Idrive after our review of the shipment.

Idrsd7.jpg

Done.

<br\><br\>


Appendix A - Idrive X2 Programming Station Documentation

Programming Station Components

  • :* New Picture Rewrite entier section for new programmer
X2 Programming Station Components
:* Computer with Monitor and speaker(s)(see requirements below)
:* Idrive V2 Programmer
Internet Connection
This
That
The Other thing
and
plus
this too
stuff
another item
Bar Code Scanner
Lens Focus Charts
:* New Picture SD Card (with firmware and filesystem files)
Micro SD card reader – primarily for RMA activity to recover events from the SD card

<br\>

Computer Hardware Minimum Requirements and Setup

  • Different requirements?
Computer Hardware Minimum Requirements
Monitor (needs to support 1600X1200 screen resolution)
Speaker(s)
Windows XP or better, Windows 7 Professional recommended
1GB RAM
100 GB Hard Disk
2 Network adaptors (NICs)

Network Adapters LAN settings:

Connection one for the Programming Fixture
- IP address: 192.168.0.10
- Subnet Mask: 255.255.0.0
- Default gateway: Blank
- Connection two for local network with access to internet
- DHCP or as required by location

<br\>

Computer Software Requirements

  • Need requirements
  • TeamViewer V9 (http://www.teamviewer.com ) - personal license. Install TeamViewer - during setup you need to choose the Personal license installation!
  • OpenJTAG Driver for USB
  • Idrive Factory Tools 2.3.0


X2 Programmer Connections

New Picture

V7-Programmer-connections.jpg

<br\><br\>


X2 Programmer Switches

New Picture

File:V7-Programmer-switches.jpg

<br\><br\>

X2 Programming Station Initialization

<br\>

1.Configure Switches on the X2 Programmer

New Picture

V7fixtswitches.jpg

Ensure all switches are in the off position as shown.

Turn On the Power switch and leave the programmer on for the batch of boards.(you do not need to turn it off to program the next board)

Note: In auto programming mode only the Power Switch is used. The other the switch functions are controlled via software





















2. Launch the Idrive Factory Tools 2.0 Application

New pictures and process

Factorytooltop.jpg
Double click the icon on the Desktop to open the application Factorytool-icon.jpg
Factory-New Devices-Auto
Select for Automatic programming of New Idrive X1 Devices (Most commonly used mode)


Factory-New Devices- Manual
Select for Manual Custom Programming of New Idrive X1 Devices


RMA
Select for RMA processing of Existing Idrive X1 Devices (Password protected)


Idrive Development


For internal Idrive Development use only (Password protected)


SETTINGS
Select to set Port number or non-standard IP addresses


Factory Wiki
Factory Manual on Admin Center



3. Configure Application Settings for the Programming Station

Same? Different

Click on Settings

Barcode Scanner Set the port number for the Barcode scanner. (Normally Human Interface Scanner)

(Port number can be checked in "Control Panel> System and Settings> Administrative Tools> Computer Management> Device Manager> Ports)

Config and Install Set the port number for the fixture.

(Port number can be checked in "Control Panel> System and Settings> Administrative Tools> Computer Management> Device Manager> Ports)

Event Test Set for non-standard IP addresses

Barcodesettings240.jpg
Portsettings250.jpg






















4. Select Programming Mode (Normally Auto)

Same? Different?

Factorytool-auto250.jpg
Click on Factory-New Devices-Auto
Serial Number field
12 character serial number for the device to be programmed as read from the bar-code label on the Motherboard. The serial number can be typed in but usually it is filled in by the bar code scanner. After the field is populated press enter and the Auto Install Button will become active.
Auto Install Button
A valid serial number must be entered for the button to be active. When selected it will open the The Automatic Install window (see below)
Lens Focus
Reenter Focus mode for a device that previously failed this step.
Event Test-Transfer and Play
For Review of Events transferred from programmed X1 series board in the Final Programming Station
Settings
Set the Port number to look for the programming fixture
Factory Wiki
This document on the Idrive Admin Center







V7 programmer final programming process

Same? Different?

1. Open the Events test - Transfer and Play window in the Factory Tool
2. Power on the wireless router
3. Turn on the "Power On/Off" Switch on the V7 Programmer
4. Plug the 6 pin power cable into the camera (No HDMI Cable is used!)
5. Turn on The "Idrive On/Off" Switch on the V7 Programmer
6. Turn on the Ignition Switch and wait for the LEDs on the camera to turn Green/Green
7. Gently shake the camera to record a shock event (Left LED will be Red during recording)
8. When both LEDs on the camera are Green turn Off the Ignition Switch (Event will download to the Factory tool)
9. Review Event(s) and check for
  • An event is present for each Camera
  • Focus and Image quality
  • Verify that the audio is working
  • Verify there is GPS data for each event


<br\><br\>

Cable Diagrams

External GPS HDMI Cable

Same? Different?

Gps22b01007 pinouts.jpg Skm53pinouts.jpg


HDMI Connector pin (Programmer Net Name) GPS22B01007 Pin SKM53 Pin
1 NC NC NC
2 NC NC NC
3 NC NC NC
4 IGND A GND
5 TXD1 B TXD
6 RXD1 NC NC
7 NC NC NC
8 NC NC NC
9 NC NC NC
10 NC NC NC
11 NC NC NC
12 NC NC NC
13 NC NC NC
14 NC NC NC
15 NC NC NC
16 NC NC NC
17 GPS_EXT_EN E VCC
18 VCC_GPS_EXT E VCC
19 NC NC NC

Appendix B - Idrive x6 Programming Station Documentation

<br\>

Idrive x6 Final Programming Station Requirements

Final Programming Station Components
Computer with Monitor and speaker(s)(see requirements below)
Idrive x6 Final Programmer
Internet Connection
USB Cable type B to type A max. 1.5m
Idrive Power Cables 6 PIN to 6 PIN
2 Cat 5E Cable (internet connection, Wireless router)
Stabilized Power Supply 12V, 6A Minimum
Bar Code Scanner
Wireless router
SD card reader – primarily for RMA activity to recover events from the SD card

<br\>

Computer Hardware Minimum Requirements and Setup

Computer Hardware Minimum Requirements and Setup
Monitor (needs to support 1600X1200 screen resolution)
Speaker(s)
Windows XP or better, Windows 7 Professional recommended
1GB RAM
100 GB Hard Disk
2 Network adaptors (NICs)

Network Adapters LAN settings:

Connection one for the Programming Fixture
- IP address: 192.168.0.10
- Subnet Mask: 255.255.0.0
- Default gateway: Blank
- Connection two for local network with access to internet
- DHCP or as required by location

<br\>

Computer Software Requirements

  • TeamViewer (http://www.teamviewer.com ) - personal license. Install TeamViewer - during setup you need to choose the Personal license installation!
  • OpenJTAG Driver for USB
  • Bar Code Scanner Software - need to identify
  • Idrive Factory Tools 2.2.0



x6 Final Programmer Connections

X6-final-Programmer-connections.jpg

<br\><br\>

x6 Final Programmer Switches

X6fixtswitchesauto.jpg

X6fixtswitchesman.jpg

<br\><br\><br\><br\>

x6 Final Test Station Initialization

1.Configure Switches on the x1 Programmer

Ensure the power switch is in the off position as shown.



2. Launch the Idrive Factory Tools 2.0 Application

Fwtransandplay.jpg
Double click the icon on the Desktop Factorytool-icon.jpg



Click on Factory - New Devices - Auto Fwfactorynewauto.jpg



Click on Event Test - Transfer and Play Fwevttesttransplay.jpg



This opens the transfer and Play window















Wireless router Setup

If a wireless router is used with the V7 programmer a small network hub is required to share the idrive programmer NIC on the computer.

  • LAN IP address 192.168.0.1
  • Network Mask 255.255.0.0
  • Default Gateway Blank
  • 5.8GHz band?
  • Encryption?
  • Same? Different? SSID bwifi
  • No DHCP
  • No DNS
  • No WAN settings (not in use)


<br\>

Appendix C - Assembly Process Stations

<br\><br\>

Wifi Mechanical Subassembly

New Pictures

Wifi1704.jpg
Station 2 – “WiFi” Mechanical Subassembly Materials
802.11agbn USB WiFi Module
WiFi cable
Antenna with cable
Low Static Hi-Temp Kapton Polyimide Film Tape 2.7 Mil, 3/8"
Wifi Plastic Carrier Lid
Double sided Tape for Antenna (Specify Type)

<br\><br\><br\><br\><br\><br\>

New Pictures

1. Connect the WiFi Cable and Antenna Cable to WiFi module. Antenna Cable must be attached to the "MAIN" connector.

<br\><br\><br\><br\><br\><br\><br\><br\>

New Pictures

Wifi3704.jpg

2. Place the Wifi and antenna into the Wifi Plastic Carrier and route the antenna cable as shown. Apply two pieces of Kapton tape to secure the wifi module to the plastic wifi carrier.

Note: The tape should never touch any portion of the PCB or circuitry. One piece must attach to the metal can with the sticker on it and cross over the antenna connection and touch nothing but plastic on the other side as shown. The second piece of tape should touch only the top of the chips and wrap around to the other side and touch only plastic as shown. This care must be taken so as not to interfere with the wifi performance!

<br\><br\><br\><br\><br\><br\><br\><br\><br\><br\><br\><br\><br\><br\>


3. Advance the Finished Wifi assembly to the Final Camera Assembly Station. Ensure the Serial Number label that came with the Wifi Module stays with the correct Wifi Assembly for the outside of the camera case.


<br\><br\>

X2 Road Case Mechanical Subassembly

New Picture without half brackets etc

Station 3 – “Road Case” Mechanical Subassembly Materials
Idrive Road Side Case
Idrive Base Support - new style?
Idrive Half Bracket Screw Side - obsolete in X2?
Idrive Half Bracket Nut Side - obsolete in X2?
M4 Nut (2x)
N4 Flat washer (2x)
M4x25 screw (2x)
3M very high bond double adhesive tape, 100C temp. resistant, 48mm width (for windshield mounting)
Retainer and Retainer Lid (pin in the middle of the support arms)- obsolete?

Need the new process and pictures for plastics


1. Stick the 3M double sided tape on the flat surface of the Bracket to cover the entire surface area. Trim the edges of the tape with a scalpel.

2. Attach the two Half Brackets with the Retainer and Retainer Lid. Press the retainer pins together to fully seat them.

3. Attach the mated Brackets to the Road Case using a screw (M4x25), one M4 nut and one N4 washer.

4. Attach the support on the other end of the brackets as shown in the picture.

New Picture

Baseassy704.JPG Roadcaseassy704.JPG

<br\><br\>

X2 Road Case Mechanical Subassembly

New Picture without half brackets etc

Station 3 – “Road Case” Mechanical Subassembly Materials
Idrive Driver Side Case
X2 IR LED Board assembly
X2 IR LED Ribbon Cable

Need the new process and pictures for IR LED assebly

1. first

2. second

3. third

4. done

New Picture of driver side case with IR Assembly

Baseassy704.JPG Roadcaseassy704.JPG

Final X1 Series Camera Assembly

Need new Picture(s)with the new board

Station 5 – “Final Assembly” Mechanical assy
GPS Assembly
Wi-Fi Assembly(With label for case)
Idrive Road Case Assembly
Low Static Hi-Temp Kapton Polyimide Film Tape 2.7 Mil, 3/8"
Idrive X1 PCB –pre-programmed PCB with Focused Lenses
Idrive Driver Side Case with IR LED board
M3x18 screw
1 Label with bar coded serial number for camera case


1. Place the Wifi assembly into the Road Case Assembly and align it with the 3 pins molded into the case. Route the Antenna Cable as shown and attach it to the case with the double sided tape. Secure the Wifi carrier to the case with a piece of Kapton Tape to prevent movement

New picture

Wifiincase704.jpg Wifisecured704.jpg

2. Connect the WiFi module to the main board (Idrive X2 PCB)

New Picture

File:Wificonnectmb704.jpg

4. Place the Main Board into The Road Case. First insert the end of the board closest to the lenses and then click in the top. Use tweezers to deflect the top tab so that excessive force is not needed to seat the board. Ensure that the Wifi cable does not obstruct the USB connector opening or the lens.

New Picture

File:Mbinstincase704.jpg

5. Place the second Bar Code Label (Serial Number) on the back of the case (make sure that the label for the case matches the label on the SD Card Connector).Need correct Picture Do we need the Wifi Label on here too for FCC etc?

File:Cambarcodelabel704.jpg

6. Insert the GPS Module into the Road Case and connect the cable to the Main Board. Ensure that the cable is not pinched between the Black Ceramic Antenna and the Plastic case. This can cut and wear out the wires!

New Picture

Gpsmodincase704.jpg

Gpscabelconnect704.jpg


7. Connect the ribbon cable from the IR LED board

8. Close the case starting with the top hooks.When the case is properly closed there should be no gap in the seam between halves of the case.

8. Fix the case with the central screw in the back.

<br\><br\>

Final Inspection and Packing

Final Inspection:

1. The correct placement of the adhesive tape on the Mounting Base

2. The correctitude of the assembly

3. No spots, no scratches etc.

4. The existence of the Serial Number and Wifi label on the back of the case


Each Idrive X2 Kit requires one each of the following:

IDR-KIT-X2-V-TBD
Completed Idrive X2 series Camera
Idrive X2 Power Cable harness Assembly
Idrive Wired Panic Button Assembly
Idrive Driver ID Assembly - is this true?